|
~ w ~ w w ~ - iw
<br />Courthouse Square
<br />Court 8~ High Street
<br />Satem, Oregon
<br />Arbuckle Costic Architects, Inc
<br />Design Development Probable Cost Estimate
<br />Ground Level
<br />Second Floor
<br />Third Floor
<br />Fourth Floor
<br />Fifth Floor
<br />Penthouse
<br />~ ^~ ~^ ~ ~ ^~ ~u
<br />~u
<br />Architectural Cost Consultants, LLC
<br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA
<br />6441 SW Canyon Court, Suite 103
<br />Portland, Oregon 97221
<br />Phone (503)297-7210 Fax (503)297-7187
<br />--
<br />23.249
<br />32.088
<br />32,088
<br />32,088
<br />32,012
<br />1.818
<br />~ +^~^ w ~
<br />Estimate Date: R21-Aug-98
<br />Document Date: 23-Ju1-98
<br />Print Date: 21-Aug-98
<br />Print Time: 11:20 AM
<br />Construction Start: Spring 99
<br />I Total Gross Area I 153,343 sf
<br />_ - -
<br />Buildin~ Shell 8 Core j Quantity Unit CosUUnit Cost Total ~
<br />DOORS, WINDOWS 8 GLASS
<br />Doors, Frames 8 Hardware (incls. installat on)
<br />exterior
<br />entry doors 3 pair
<br />automatic opener 2 pair
<br />transit & county entry 4 ea
<br />automatic doors 1 pair
<br />retail entry 3 ea
<br />pair 1 pair
<br />stair egress ~ 1 pair
<br />I penthouse, transformer, mech ~ 6 ea
<br />interior doors
<br />1 st flr lobby 4 pair
<br />tenant entry 36 ea
<br />pair 'I 4 pair
<br />restroom 8 ea
<br />utility, janitor rooms , 25 ea
<br />stair ~ 11 pair
<br />penthouse ' 2 ea
<br />~~ Subtotal ~
<br />~
<br />
<br />I Relites, Sidelites 8~ Transoms
<br />I I
<br />main lobby transom 96 sf
<br />main lobby @ 2nd floor 80 sf
<br />@ tenant entries
<br />I
<br />2nd 8 ea
<br />3rd i~ 6 ea
<br />4th ' S ea
<br />5th 6 ea
<br />Subtotal
<br />2,800.00 8,400
<br />3,500.00 7,000
<br />1,200.00 4,800
<br />10,000.00 10,000
<br />1,200.00 3,600
<br />2,800.00 2,800
<br />2,600.00 2,600
<br />850.00 5,100
<br />2,800.00 11,200
<br />900.00 32,400
<br />1,975.00 7,900
<br />700.00 5,600
<br />750.00 18,750
<br />2,600.00 28,600
<br />775.00
<br />_ 1,550
<br />---__ _ - - -
<br /> 150,300
<br />01 01 0l 0
<br />8,400
<br />7,000
<br />a,800
<br />10,000
<br />3,600
<br />2,800
<br />2,600
<br />5,100
<br />11.200
<br />32,400
<br />7,900
<br />5,600
<br />18,750
<br />28,600
<br />1,550
<br />150,300
<br />- - _ _ _ __
<br />Comments
<br />30.00 2,880 2,880
<br />30.00 2,400 2,400 verify plan vs sctn & elvtn
<br />430.00 3,440 3,4a0 assume 7'2" x 2'0"
<br />430.00 2,580 2,58o assume 7'2" x 2'0"
<br />430.00 2,150 2,150 assume 7'2" x 2'0"
<br />430.00 2,580 2,58o assume 7'2" x 2'0"
<br />16,030 0 0 0 0 16,030
<br />Building Shell & Core Detail Estimate - Page 9
<br />
|