My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Design Development Construction Cost Estimate
>
CS_Courthouse Square
>
Design Development Construction Cost Estimate
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:08:30 AM
Creation date
9/6/2011 10:32:45 AM
Metadata
Fields
Template:
Building
RecordID
10335
Title
Design Development Construction Cost Estimate
Company
Architectural Cost Constultants
BLDG Date
8/21/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Courthouse Square - -- - _ - - ___ _ _ - -- - - <br />j Architectural Cost Consultants, LLC <br />Court & High Street ~ James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />Salem, Oregon I 6441 SW Canyon Court, Suite 103 <br />Arbuckle Costic Architects, Inc Portiand, Oregon 97221 <br />I Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 <br /> <br />Ground Level _ - _ <br />~ 23,249 <br />Second Floor I 32,088 <br />Third Floor 32,088 <br />Fourth Floor 32,088 <br />Fifth Floor 32,012 <br />Penthouse 1,878 <br />~ Total Gross Area 153,343 <br /> <br />Buildin~ Shell & Core _ -- - <br />~ Quantity Unit CosUUrnt Cost Total <br />_ _ ---- - - <br />MOISTURE - THERMAL CONTROL - Con inued <br />Flashing & Sheet Metal <br />gutters If 0.00 0 <br />downspouts , 60 If 10.00 600 <br />i scuppers 4 ea 175.00 700 <br />flashing <br />parapetcap <br />@ bay windows 100 If 13.00 1,300 <br />building 812 If 10.00 8,120 <br />penthouse 507 If 10.00 5,070 <br />! parapet backing 2,842 sf 3.50 9,947 <br />miscellaneous ; 1 sum 3,000.00 3,000 <br />Subtotal ' 28,737 0 0 <br />Skylights / Canopies <br />north elevation ~ sf 0.00 0 <br />east elevation sf 0.00 0 <br />; south elevation sf 0.00 0 <br />; west elevation sf 0.00 0 <br />; fifth floor canopies / sun screens sf 0.00 0 <br />Subtotal ~ 0 0 0 <br />' Caulking & Sealants <br />caulking / sealants , 153,343 sf 0.20 30,669 <br />-- --- <br />' Subtotal <br />I <br />T 30,669 SO a0 <br />TOTAL - MOISTURE - THERMAL CON ROL ~395,126 So a0 <br />Building Shell & Core Detail Estimate - Page 8 <br />Estimate Date: R21-Aug-98 <br />~ Document Date: 23-Ju1-98 <br />I Print Date: 21-Aug-98 <br />Print Time: 11:20 AM <br />Construction Start: Sprin~ 99 <br />_ Comments <br />0 NIC <br />60o pen~ <br />700 <br />1,300 <br />8,120 <br />5,070 <br />9.947 <br />3,000 <br />0 0 28,737 <br />ol o <br />so~ ao <br />to roof level <br />o NIC w/ bus mall <br />0 NIC w/ streetscape <br />o NIC w/ streetscape <br />o NIC w/ streetscape <br />0 NIC <br />0 <br />30,669 <br />aso,sss <br />395,126 2.58 <br />~ ~ ~ ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.