Laserfiche WebLink
~^^ w ~ w n~ ~n <br />~Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />Ground Level <br />Second Floor <br />Third Floor <br />Fourth Floor <br />Fifth Floor <br />Penthouse <br />Total Gross Area <br />CBuildin~ Shell 8 Core <br />DOORS, WINDOWS & GLASS <br />Doors, Frames 8~ Hardware (incls. installat <br />~ exterior <br />entry doors <br />automatic opener <br />transit & county entry <br />' automatic doors <br />retail entry <br />pair <br />stair egress <br />penthouse, transformer, mech <br />I interior doors <br />1 st flr lobby <br />I, tenant entry <br />pair <br />restroom <br />utility, janitor rooms <br />stair <br />penthouse <br />Subtotal <br />Relites, Sidelites 8~ Transoms <br />main lobby transom <br />; main lobby @ 2nd floor <br />@ tenant entries <br />~ 2nd <br />3rd <br />4th <br />5th <br />Subtotal <br />~^ w <br />~ ^^~ ~ ^^~ ~ <br />_----- -- <br />Architectural Cost Consultants, LLC <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portland, Oregon 97221 <br />Phone (503)297-7210 Fax (503)297-7187 <br />. 23.249 <br />32,088 <br />32, 088 <br />32,088 <br />32,012 <br />1,818 <br />153,343 <br />Quantit~r Unit CosUUnit Cost Total <br />3 pair 2,800.00 8,400 <br />2 pair 3,500.00 7,000 <br />4 ea 1,200.00 4,800 <br />1 pair 10,000.00 10,000 <br />3 ea 1,200.00 3,600 <br />1 pair 2,800.00 2,800 <br />1 pair 2,600.00 2,600 <br />6 ea 850.00 5,100 <br />4 pair 2,800.00 11,200 <br />36 ea 900.00 32,400 <br />4 pair 1,975.00 7,900 <br />8 ea 700.00 5,600 <br />25 ea 750.00 18,750 <br />11 pair 2,600.00 28,600 <br />2 ea 775.00 1,550 <br />96 sf 30.00 2,880 <br />80 sf 30.00 2,400 <br />', 8 ea 430.00 3,440 <br />~ 6 ea 430.00 2,580 <br />i 5 ea 430.00 2,150 <br />i 6 ea 430.00 2,580 <br /> 8,aoo <br /> 7,000 <br /> a,8oo <br /> 10,000 <br /> 3,600 <br /> 2.800 <br /> 2,600 <br /> 5,100 <br /> 11,200 <br /> 32,400 <br /> 7,900 <br /> 5,600 <br /> 18,750 <br /> 28,600 <br /> 1,550 <br />50,300 0 0 0 0 150,300 <br /> 2,880 <br /> 2,400 <br /> 3,440 <br /> 2,580 <br /> 2,150 <br /> 2,580 <br />16,030 0 0 0 0 16,030 <br />~ ~ w a ~ ~^ <br />-- --- - __ -- --- - -- - - - <br />Estimate Date: R21-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 21-Aug-98 <br />Print Time: 11:20 AM <br />j Construction Start: Sprin~ 99 <br />Comments <br />_ _- <br />~erify plan vs sctn & elvtn <br />assume 7'2" x 2'0" <br />~ssume 7'2" x 2'0" <br />3ssume 7'2" x 2'0" <br />assume 7'2" x 2'0" <br />Building Shell & Core Detail Estimate - Page 9 <br />