Courthouse Square
<br />Court & High Street
<br />Salem, Oregon
<br />Arbuckle Costic Architects, Inc
<br />Design Development Probable Cost Estimate
<br />~ Ground Level
<br />Second Floor
<br />Third Floor
<br />Fourth Floor
<br />Fifth Floor
<br />Penthouse
<br />Total Gross Area
<br />Buildin~ Shell & Core
<br />FINISHES - Continued
<br />Ceramic Tile - Continued
<br />base
<br />type A
<br />type E
<br />wall tile
<br />type A
<br />type C
<br />exterior @ grnd flr windows
<br />Subtotal
<br />Resilient
<br />vct
<br />rubber base
<br />Subtotal
<br />Carpet
<br />type 4
<br />type 7
<br />type 8
<br />Subtotal
<br />Paint & wallcoverings
<br />sealed conc. floor
<br />transformer room
<br />tenant areas
<br />retail area
<br />penthouse
<br />paint / finish door & frame
<br />paint / finish relite frame
<br />paint gypboard ceilings
<br />paint fascia
<br />paint exterior soffits
<br />_ _ - _ __ ____-- _ __. ___ ___--- - _ ----
<br />Architectural Cost Consultants, LLC
<br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA
<br />6441 SW Canyon Court, Suite 103
<br />Portland, Oregon 97221
<br />Phone (503)297-7210 Fax (503)297-7187
<br />_ 23,249 .
<br />32, 088
<br />32,068
<br />32,088
<br />32,012
<br />1,818
<br />_ -_
<br />159,343
<br />Quantity Unit CosUUnit Cost Total
<br />564 If
<br />584 If
<br />2,602 sf
<br />1,021 sf
<br />674 sf
<br />2,506 sf
<br />2,679 If
<br />23.8 sy
<br />84.0 sy
<br />459.2 sy
<br />~ 722 sf
<br />~ 108,816 sf
<br />~ 3,582 sf
<br />1,692 sf
<br />113 ea
<br />25 ea
<br />4,784 sf
<br />~ 108 sf
<br />j 10,266 sf
<br />12.00 6,768 6,768
<br />10.75 6,278 6,278
<br />8.50 22,117 22,~1~
<br />45.00 45,945 a5,sa5
<br />10.00 6,740
<br />_ __ - -- 6,7ao
<br />130,649 0 0 0 0 130,649
<br />1.75 4,386 4,386
<br />1.50 4,019 a,019
<br />8,404 a0 a0 SO $0 a8,404
<br />42.00 1,000 1,000
<br />36.00 3,024 3,02a
<br />18.65 8,564
<br />_ --- - -- g,~q
<br />12,588 s0 $o a0 a0 $12,588
<br />0.35 253 253
<br />0.35 38,086 38,086
<br />0.50 1, 791 ~ ,~g~
<br />0.35 592 592
<br />60.00 6,780 6,780
<br />40.00 1,000 1,000
<br />0.60 2,870 2.870
<br />0.65 70 7p
<br />0.65 6,673 6,B73
<br />_ _ __ _ _
<br />Comments
<br />Building Shell & Core Detail Estimate - Page 12
<br />Estimate Date: R21-Aug-98
<br />Document Date: 23-Ju1-98
<br />Print Date: 21-Aug-98
<br />Print Time: 11:20 AM
<br />Construction Start: Sprin~ 99
<br />
|