Laserfiche WebLink
~ ~ ~ ~ ~ e <br />Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />Fourth Floor <br />Total Area <br />METALS <br />Miscellaneous metals <br />miscellaneous <br />Subtotal <br />_ _ <br />TOTAL - METALS <br />_ . <br />WOOD & PLASTICS _ <br />Rough carpentry <br />miscellaneous blocking & backing <br />Subtotal <br />Finish carpentry <br />item <br />Subtotal <br />Casework <br />break room <br />base cabinet <br />wall cabinet <br />rod & shelf <br />large conference <br />base cabinet <br />wellness center <br />base cabinet <br />copy / work <br />base cabinet <br />wall cabinet <br />waiting <br />rod & shelf <br />~ _ ~ ~ ~ ~ ~ ~ ~ ~ e ~ ~ <br />- -_ _ _ --- _ _ _.__ _ _ _ _ <br />Architectural Cost Consultants, LLC Estimate oate: R2~-au9-se <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Portland, Oregon 97221 Print Time: 11:42 AM <br />Phone (503) 297-7210 Fax (503) 297-7187 _ _ _ __ Construction Start: Sprin~ 99_ <br />__ __ ____ - _ _ _ __ _ __ _ _ i <br />28,279 I <br />28,279 sf <br />_ __ _ __ - - - -- -- --- ---- . _- -_..__ __ _ _ _ _ __ I <br />28,279 sf 0.07 1,980 1,980 0 <br />- ------ <br />. 1,980 1,980 0 <br />. --- <br />-- - -- _ _ -- -_ __-__ _ <br />_ _ __ --- _ ---a1,980 $1,980 $0 0.07 <br />_ _ __ _ - __ --- -- - <br />- -~ <br />28,279 sf <br />1 sum <br />0.10 2,828 <br />_ _ _ - -- - -- <br />2,828 <br />0.00 0 <br />0 <br />2,828 0 <br />2,828 0 <br />0 0 NIC <br />0 0 <br />plastic laminate <br />12.0 If 165.00 1,980 1,980 0 <br />12.0 If 85.00 1,020 1,020 0 <br />7.0 If 20.00 140 140 0 <br />6.0 If 185.00 1,110 1,110 0 <br />25.0 If 165.00 4,125 4,125 0 <br />14.0 If 165.00 2,310 2,310 0 <br />14.0 If 85.00 1,190 1,190 0 <br />7.0 If 20.00 140 140 0 <br />Fourth Floor Tenant Improvements Detail Estimate - Page 1 <br />