My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Design Development Construction Cost Estimate
>
CS_Courthouse Square
>
Design Development Construction Cost Estimate
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:08:30 AM
Creation date
9/6/2011 10:32:45 AM
Metadata
Fields
Template:
Building
RecordID
10335
Title
Design Development Construction Cost Estimate
Company
Architectural Cost Constultants
BLDG Date
8/21/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CourthOUSe Square _ _ _ _ _ - ------ _ _ __ _ _ _ - _ <br />Architectural Cost Consultants, LLC - - . <br />Estimate ~ate: R2~-Aug-se <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczoikowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:42 AM <br />Design Development Probable Cost Estimate ___ Phone (503) 297-7210 Fax (503) 297-7187 _ _ _ Construction Start: Spring 99 <br /> <br />Fourth Floor __ _ --- -. __ - - <br />28,279 <br />_ <br />. <br />Total Area 28,279 sf <br />- <br />Fourth Floor Tenant Finishes <br />__ <br />Quantity <br />. __ _ <br />Unit <br />- - -- - -- <br />CosUUnit Cost Total __ <br />_ - - -- --- -- - _ _ -- --- _ - -- - -- -_ --- <br />Comments <br />- - - - _ - - --- <br />_ <br />WOOD & PLASTICS - Continued I <br />Casework - Continued <br />reception <br />counter 27.0 If 275.00 7,425 7,425 0 <br />work / copy <br />base cabinet i 11.0 If 165.00 1,815 1,815 0 <br />wall cabinet ~ 11.0 If 85.00 935 935 0 <br />counter 17.5 If 90.00 1,575 1,575 0 <br />island cabinet 6.0 If 300.00 1,800 1,800 0 <br />toilet room <br />lav counter 12.0 If 95.00 1,140 1,140 0 <br />Subtotal ! <br />1 26,705 26,705 0 0.94 <br /> <br /> <br />TOTAL - WOOD & PLASTICS <br />- ------ -___ __-- <br /> <br />529,533 $29,533 <br /> <br />$0 <br /> <br />1.04 <br />- - - -- - <br />MOISTURE - THERMAL CONTROL _ --- - -- -- ___------ - _ __ _ _ _ _ _-------- - <br />Firesafing <br />allowance 28,279 sf 0.02 500 <br />__ __ __ _ ____. 500 0 <br />Subtotal ~ 500 500 0 <br />Caulking & Sealants ~ <br />caulking / sealants ' 28,279 sf 0.05 1,500 1,500 0 <br />Subtotal 1,500 1,500 0 <br />-- - - --- _ <br />TOTAL - MOISTURE - THERMAL CONTROL __ _ _ <br />a2,000 <br />$2,000 <br />$0 <br />0.07 <br />Fourth Floor Tenant Improvements Detail Estimate - Page 2 <br />I ~ ~ ~ ~ ~ ~ ~ r - ~ ~ ~ ~ ~ _ ~ <br />w <br />
The URL can be used to link to this page
Your browser does not support the video tag.