My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Design Development Construction Cost Estimate
>
CS_Courthouse Square
>
Design Development Construction Cost Estimate
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:08:30 AM
Creation date
9/6/2011 10:32:45 AM
Metadata
Fields
Template:
Building
RecordID
10335
Title
Design Development Construction Cost Estimate
Company
Architectural Cost Constultants
BLDG Date
8/21/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <br />_ -_ __ _ - - --- _ _ _ <br />Courthouse Square Architectural Cost Consultants, LLC <br />Court & High Street i James A. Jerde, AIA - Staniey J. Pszczolkowski, AIA <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 <br />_ ___ - _ - <br />Fourth Floor 2g,27g <br />Total Area 28,279 sf <br />~ ~ ~ ~ ~ <br />Estimate Date: R21-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 21-Aug-98 <br />Print Time: 11:42 AM <br />Construction Start: Spring 99 <br /> <br />_ _ _ _ __ _ _ <br />DOORS, WINDOWS & GLASS <br />_ <br />_ <br />Doors, Frames & Hardware (incls. installation <br />interior doors <br />office & conf <br />pair <br />toilet <br />other <br /> <br />33 <br />1 <br />2 <br />10 <br /> <br />ea <br />pair <br />ea <br />ea <br /> <br />750.00 <br />2,400.00 <br />700.00 <br />750.00 <br /> <br />24,750 <br />2,400 <br />1,400 <br />7,500 <br /> <br />24,750 <br />2,400 <br />1,400 <br />7,500 <br /> <br />0 <br />0 <br />0 <br />0 <br />Subtotal <br />i <br />Relites, Sidelites & Transoms ~ <br />conference <br />computer room <br /> <br /> <br />8 <br />12 <br /> <br /> <br />f <br />sf <br /> <br /> <br />0.00 <br />30.00 <br />__ <br /> <br /> <br />40 <br />360 <br /> <br />- 36,050 <br /> <br /> <br /> <br />- 36,050 <br /> <br /> <br />840 <br />360 0 <br /> <br /> <br />0 <br />0 <br />Subtotal <br />Glass & Glazing ~ <br />plate mirror ; <br /> <br />48 <br /> <br />sf <br /> <br />11.00 <br /> <br />528 <br />_ --- --_ 1,200 <br /> <br /> <br />_ 1,200 <br /> <br />528 0 <br /> <br />0 <br /> <br />Subtotal <br /> <br />- - - <br />528 <br />- --- <br />528 <br />0 <br />TOTAL - DOORS, WINDOWS & GLASS <br />_ __ _ _ _ _ <br />_ <br />537,778 <br />$37,778 <br />$0 <br /> - - _ - - __ _------ -- ----- --- -- <br />FINISHES <br />_ _ _ _ _ <br />_-- <br />_ _ <br /> <br />-- - -- - - _ <br /> <br />_ _---- <br />Partitions ~ <br />I typical partitions 15,598 sf 4.35 67,851 67,851 <br />; plumbing chase partition 126 sf 7.00 882 882 <br />~ furr columns 2,214 sf 3.50 7,749 7,749 <br />~~ acoustic @ above 7,799 sf 0.65 5,069 5,069 <br />furring @ concrete wall 748 sf 2.25 1,683 1,683 <br />i suspended gypboard ceiling systems I <br />i toilet room 362 sf 3.75 <br />_ 1,358 <br />_ --- 1,358 <br />~ Subtotal ~ 84,592 84,592 <br />0 <br />0 <br />0 verify <br />0 <br />01 <br />0 <br />1.34 J <br />- _- -- - ~ <br />__ __ ___ 1 <br />Fourth Floor Tenant Improvements Detail Estimate - Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.