Laserfiche WebLink
',Courthouse Square I Arc6itectural Cost Consultants, LLC Estimate Date: R21-Aug-98 <br />'COUrt & High Stfeet ~ James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon ' 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:12 AM <br />, Design Development Probable Cost Estimate ' Phone (503) 297-7210 Fax (503) 297-7187 _ Construction Start: Spnng 99 <br /> _ <br />_ <br />DIRECT CONSTRUCTION COST SUMMARY <br />Component <br />Building Shell & Core <br />Parking <br />Bus MaII <br />Subtotal <br />Streetscape <br />Subtotal <br />~ Area <br />153,343 sf <br />70,793 sf <br />66,528 sf <br />224,136 sf <br />I 33,720 sf <br />I <br />~ 33,720 sf <br />~~ <br />a/SF <br />73.45 11,262,900 <br />42.67 3,020,512 <br />37.63 2,503,582 <br />74.90 <br />$16,786, 995 <br />50.15 1,691,150 <br />50.15 $1,691,150 <br />Tenant Finishes ' ' <br />Ground Level Tenant Finishes , 13,930 sf 42.85 596,862 <br />Second Floor Tenant Finishes I 27,552 sf 17.49 481,994 <br />Third Floor Tenant Finishes ', 28,279 sf 24.66 697,318 <br />Fourth Floor Tenant Finishes 28,279 sf 22.72 642,601 <br />Fifth Floor Tenant Finishes 16,850 sf 31.11 524,203 ' <br />~ 114,890 sf 25.62 $2,942,978 , <br /> <br />TOTAL DIRECT CONSTRUCTION COST ~ <br />$21,421,123 <br />B <br />0 <br />Indicated Surplus / (Deficit) (21,421,123) <br />ALTERNATES <br />1 Parking Altemate 1 23,278 sf Add t 930,300 <br />2 Parking Alternate 2 19,467 sf Add t 808,500 <br />30 0 <br />40 Q <br />The above estimates are for direct construction cost only. They do not include fumishings & equipment, consultant <br />fees, inspection and testing fees, plan check fees, hazardous material testing and removal, financing costs, nor any <br />other normally associated development costs. <br />The above estimates assume a competitively bid project, with at least three qualified bidders in each of the major <br />sub-trades as well as the general contractors. All work to be contracted at one time (shell 8~ core, street 8~ bus mall and <br />tenant improvements). If project is to be phased, additional cost associated with phasing to be added. <br />The above estimates assume a construction start date of: Spring 99 If the start of construction is delayed <br />beyond the date above, the estimates must be indexed at a rate of 4-6°/a per year compounded. <br />Cost Comments <br />Summary - Page 1 <br />