<br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98
<br />CoUrt & Hlgh Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98
<br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98
<br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:20 AM
<br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 _ Construction Start: Spring 99
<br />I - _ _ _- - - _ _
<br />Parking Level One 70,793
<br />_ _ _ _ _ _ -_ __ -
<br />Gross Area 70,793 sf
<br />_ ___ - _ - -- - -
<br />Parking Quantity Unit CosUUnit Cost _ Total Comments
<br />CONCRETE - Continued
<br />finishing
<br />set screeds
<br />cure
<br />seal
<br />trowel
<br />float slab
<br />finish topping slabs
<br />3" @ drive lane
<br />3" It weight
<br />3" @ building plaza
<br />float footings
<br />break ties 8~ plug voids @ walls
<br />Subtotal
<br />Miscellaneous
<br />waterstop
<br />house keeping pads
<br />Subtotal
<br />Precast Concrete
<br />185,895 sf 0.20 37,179 37,179
<br />185,895 sf 0.08 14,872 14,872
<br />185,895 sf 0.06 11,154 11,154
<br />113,538 sf 0.60 68,123 68,123
<br />72,357 sf 0.40 28,943 14,471 14,471 0
<br />14,356 sf 0.45 6,460 6,460
<br />24,728 sf 0.45 11,128 11,128
<br />7,988 sf 0.45 3,595 3,595
<br />2,660 sf 0.40 1,064 1,064
<br />25,705 sf 0.55 14,138 14,138
<br /> _ _--
<br />196, 654
<br />14,471
<br />14,471
<br />167,711
<br />1,116 If 4.50 5,022 5,022
<br />300 sf 8.00 2,400 2,400
<br /> _- ----
<br />7,422
<br />0
<br />0
<br />7,422
<br />precast wheel stops 192 ea 0.00 0 0 NIC
<br />
<br />Subtotal __ ___ _ __-
<br />0
<br />0
<br />0
<br />0
<br />
<br />-- _ - -
<br />_ --
<br />TOTAL - CONCRETE
<br />
<br />~1,586,655
<br />
<br />$399,374
<br />
<br />$399,374
<br />
<br />787,907
<br />
<br />22.41
<br /> _ _
<br />_ _ _ _ _
<br />MASONRY _ _ _ . _ _ _ _ _ - - - -- _ __ _---- -- ----- ---
<br />
<br />__ _--____
<br />_ - -- __ _ __ ___ _ -- --- -- --_ _
<br />Concrete Masonry Units (CMU) 1
<br />6" partitions ' 4,910 sf 8.50 41,735 41,735 storage & lobby walls
<br />north ramp wall (for veneer backup) 1,080 sf 8.50 9,180
<br />_ __ ---- 9,180 verify
<br />Subtotal 50,915 0 0 50,915
<br />TOTAL - MASONRY S50 915
<br />--- -- _ __-- '-- _$0
<br />- $0
<br />- -- --- $50,915 0.72
<br />-- - - --
<br />Parking Detail Estimate - Page 5