Laserfiche WebLink
Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />___. <br />Parking Level One <br />Gross Area <br />Parkin~ <br />~ METALS <br />Miscellaneous metals <br />steel stair <br />stair landing <br />railings <br />stair guardrail <br />stair wall rail <br />i miscellaneous (embeds, etc.) <br />Subtotal <br />--.. __ ___ _ __ <br />TOTAL - METALS <br />~ - - <br />~ WOOD & PLASTICS <br />I Rough carpentry <br />I, miscellaneous blocking <br />Subtotal <br />, TOTAL - WOOD & PLASTICS <br />MOISTURE - THERMAL CONTROL <br />! Waterproofing & Damproofing <br />i underslab waterproofing <br />i waterproof foundation walls <br />~ Subtotal <br />Trafflc Coating <br />entry ramp <br />parking level <br />I <br />Subtotal <br />~ Insulation <br />I Rigid insulation <br />,' roof R-19 <br />~ exterior concrete wall R-11 <br />; Subtotal <br />_ - - _ _ - - - -_ _- __ _ _ ---- - - - - -- - _ <br />Architectural Cost Consultants, LLC _ _ _ _ _ _ __- - _ <br />Estimate Date: R21-Aug-98 <br /> James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />I 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br /> Portland, Oregon 97221 Print Time: 11:20 AM <br /> Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br /> -- - - <br />_ - -- -__ _ -- <br />70,793 <br />_ <br />-- <br />_ <br /> <br />_ <br /> <br />_ <br /> <br />- - - -- - - <br /> <br /> <br />_ _ _ <br />70,793 sf --- <br />- - <br /> <br /> <br />Quantit _ _ <br /> <br />U <br />it _ _ _ . <br /> <br />C <br />UU <br />it _ .__. __ _ _. <br />- ,,. <br />C <br />t T <br />l <br />.. __- - - _ __- <br />~ <br />y n os <br />n os <br />ota Comments <br /> <br />I <br />~ 36 __ <br /> <br />risers <br /> <br />105.00 - <br /> <br />3,780 <br />--- <br /> <br />3,780 <br />408 sf 30.00 12,240 12,240 <br />~ 60 If 55.00 3,300 3,300 <br />56 If 30.00 1,680 1,680 <br />i 70,793 sf 0.20 14,159__ _ 14,159 <br /> <br />1 35,159 0 0 35,159 <br />_ ___ __-- -__ _ __------- -- __ <br />_ ___ _ _ a35,159 <br />$0 <br />$0 <br />$35,159 <br />0.50 <br /> <br /> <br />I _ <br />~~I 1 _ _ <br />sum _ _ ____ <br />500.00 _ _ _ . __ <br />500 <br />500 _ <br /> 500 0 0 500 <br />~ _ _ <br />-- _ __ <br />_ _ __ -- - -_ --- <br />_ -- $500 <br />$0 <br />$0 <br />$500 <br />0.01 <br /> <br />i _ <br />~ <br />6,050 _ <br /> <br />sf _ ---- _ . <br /> <br />2.75 --- -- _ <br /> <br />16,638 <br /> <br />16,638 <br /> <br />per CWEC <br />I 11,903 sf 3.00 35,709 <br />_---- - - 35,709 <br /> <br />~ 52,347 0 0 52,347 <br />~ <br />~ 1,238 <br />sf <br />3.00 <br />3,714 <br />3,714 <br />verify <br />'~ 88,354 sf 0.00 0 <br />--- - - - 0 NIC - verify <br />: 3,714 0 0 3,714 <br />' 0 sf 0.00 0 0 NIC - verify <br />, 0 sf 0.00 0 0 NIC - verify <br /> 0 0 0 0 <br />Parking Detail Estimate - Page 6 <br />