My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Design Development Construction Cost Estimate
>
CS_Courthouse Square
>
Design Development Construction Cost Estimate
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:08:30 AM
Creation date
9/6/2011 10:32:45 AM
Metadata
Fields
Template:
Building
RecordID
10335
Title
Design Development Construction Cost Estimate
Company
Architectural Cost Constultants
BLDG Date
8/21/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
s ~ ~ ~ ~ <br />Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />Second Floor <br />Total Area <br />Second Floor Tenant Finishes <br />M ETALS <br />Miscellaneous metals <br />, miscellaneous <br />!, Subtotal <br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <br />_ _ _ ---- <br />_ _ _ _ _-- - <br />----- - - -- <br />Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98 <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Portland, Oregon 97221 Print Time: 11:42 AM <br />Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />27,552 <br />- . 27,552 sf <br />- _ - -- --- - - ---- --- _ _ ----- <br />Quantity Unit CosUUnit Cost Total Comments <br />_ - _ _ _ _ -- - --- _. . <br />27,552 sf 0.07 1,929 <br />~ <br />._ <br />I TOTAL - METALS <br />,I ---- <br />WOOD & PLASTICS <br />i _ -- <br />, Rough carpentry <br />'~ miscellaneous blocking & backing <br />Subtotal <br />j Finish carpentry <br />~ finish work - allowance <br />Subtotal <br />i <br />Casework <br />; break room (2) <br />base cabinet <br />I wall cabinet <br />~, building inspect <br />', 36" wide public counter <br />!, copy / rec <br />counter <br />deeds <br />II island base cabinet <br />peninsula map cabinet <br />~~I computer stations <br />Subtotal <br />~ _ - _ _ _- <br />TOTAL - WOOD & PLASTICS <br />27,552 sf <br />1 sum <br />17.5 If <br />11.5 If <br />51.0 If <br />32.0 If <br />21.0 If <br />12.0 If <br />12.0 If <br /> 1,929 0 <br />1,929 1,929 0 <br />~1,929 $1,929 $0 <br />0.10 2,755 <br />- - - __ _ _ _ ---- <br />2, 755 <br />0.00 0 <br />_ _0 <br />165.00 <br />85.00 <br />275.00 <br />90.00 <br />250.00 <br />300.00 <br />90.00 _ <br />2,888 <br />978 <br />14,025 <br />2,880 <br />5,250 <br />3,600 <br />1,080 <br />30,700 <br />a33,455 <br />7551 0 <br />0 <br />0 <br />2,888 <br />978 <br />14,025 <br />2,880 <br />5,250 <br />3,600 <br />1,080 <br />30,700 <br />OINIC <br />0 <br />0 <br />0 <br />0 <br />0~ <br />~ <br />0 <br />0 <br />0'~ <br />$0', <br />1.11 <br />1.21 <br />Second Floor Tenant Improvements Detail Estimate - Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.