My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Design Development Construction Cost Estimate
>
CS_Courthouse Square
>
Design Development Construction Cost Estimate
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:08:30 AM
Creation date
9/6/2011 10:32:45 AM
Metadata
Fields
Template:
Building
RecordID
10335
Title
Design Development Construction Cost Estimate
Company
Architectural Cost Constultants
BLDG Date
8/21/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
__ -_ _ _ - _ ____ -- - _ - --- ------------ --- - --- - _ ----- -- - -- -_ _ ---- <br />Courthouse Square ~ Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98 <br />COUrt & High Street I James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:42 AM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />, _ - - --- - - _ -- _ _ _- -- - - _ _ _ - - -- -- -- _ _ -- <br />~ Second Floor 27,552 <br />~ Total Area 27,552 sf <br />- -_ - -- --- - - _ __ ----- --- - - --- -__ __..._--- <br />Second Floor Tenant Finishes Quantity _ Unit Cost/Unit Cost Total Comments <br />MOISTURE - THERMAL CONTROL <br />Firesafing <br />allowance 27,552 sf <br />Subtotal <br />Caulking & Sealants <br />caulking / sealants 27,552 sf <br />Subtotal <br />_ _ _ --_ , _ __-- ___-- <br />TOTAL - MOISTURE - THERMAL CONTROL <br />'~, DOORS, WINDOWS & GLASS <br />Doors, Frames & Hardware (incls. installation <br />interior doors <br />0.02 500 ~ 500 ~ 0 <br />500 500 0 <br />0.05 1,500 1,500 0 <br />1,500 1,500 0 <br />-- ----- -_. _ -- _ __----- <br />52.000 $2.000 $0 <br />office & conf room 21 ea 750.00 15,750 <br />other 9 ea 750.00 6,750 <br />Subtotal 22,500 <br />Relites, Sidelites & Transoms I <br />relite sf <br />sidelite i sf <br />Subtotal I <br />~ <br />_ _ __ - - _ _ -- <br /> <br />TOTAL - DOORS, WINDOWS & GLASS ___ <br />_. <br />_ _ _ _ __ <br /> <br />-___ <br />FINISHES <br />_ - - _ - - -- - __ _ _ __ i <br /> <br />_ ___ <br />_ _ <br /> <br />- -- ----- <br />Partitions <br />typical partitions 9,288 sf <br />furr columns 2,160 sf <br />acoustic @ above 4,644 sf <br />furring @ concrete wall , 748 sf <br />Subtotal I <br />0.00 0 <br />0.00 0 <br />--- ___ - -- - . -- <br />--- ---- -- - 0 <br />~22,500 <br />4.35 40,403 <br />3.50 7, 560 <br />0.65 3,019 <br />2.25 -- -- 1,683 _ _ __ <br />52, 664 <br />15,750 0 <br />6,750 0 <br />22, 500 0 <br />-- OA7-------- <br />__ _. <br />0 0 NIC <br />0 0 NIC <br />0 0 <br />40,403 0 <br />7, 560 0 <br />3,019 0 verify <br />1,683 0 <br />52,664 0 <br />0.82 <br />Second Floor Tenant Improvements Detail Estimate - Page 2 <br />~ ~ ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.