My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Design Development Construction Cost Estimate
>
CS_Courthouse Square
>
Design Development Construction Cost Estimate
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:08:30 AM
Creation date
9/6/2011 10:32:45 AM
Metadata
Fields
Template:
Building
RecordID
10335
Title
Design Development Construction Cost Estimate
Company
Architectural Cost Constultants
BLDG Date
8/21/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ~ ~ v ~ ~ <br />Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />Third Floor <br />Total Area <br />Third Floor Tenant Finishes <br />I METALS <br />Miscellaneous metals <br />miscellaneous <br />Subtotal <br />TOTAL - METALS <br />s s ^~ ~ ~ ~ ~ ~ ~ ~ s ~ ~ <br />_ - - - -- - -- - - - _ --- ---- - _---- <br />Architectural Cost Consultants, LLC _ _ -- -- - ---- - _ _- - _ _ _ -- - - <br />Estimate Date: R21-Aug-98 <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Portland, Oregon 97221 Print Time: 11:42 AM <br />Phone (503) 297-7210 Fax (503) 297-7187 I Construction Start: Spring 99 <br />i ___ _ __ __ ___ _ <br />-- - -- - _ ___ <br /> <br />28~279 <br />_--- <br />_ - <br /> <br />- - <br /> <br /> <br />_ _ - - <br />_ - - _ - <br />28,279 sf <br />sf <br />-- _------ - __ _ - - <br />Quantity Unit Cost/Unit Cost Total - <br />Comments <br />~ - - ---__ __ _ <br />I . <br />28,279 sf 0.07 1,980 <br />- - -- _ _-- 1,980 0 <br />1,980 1,980 0 <br />_ - -- __ -- __ __ _ . <br />51,980 <br />$1,980 <br />$0 <br />0.07 <br /> <br />___ __ __ _- <br />-----____ _ _ _- _- -- <br />- ---_ _-- - _ --~ <br />WOOD 8~ PLASTICS <br />I - - -- <br />Rough carpentry <br />; miscellaneous blocking & backing <br />' Subtotal <br />Finish carpentry <br />' item <br />'~ Subtotal <br />I Casework <br />break room <br />~'~~ base cabinet <br />I wall cabinet <br />I, wait / reception <br />' through-wall counter <br />j counter <br />I work / copy / file <br />base cabinet <br />victim assistance <br />84" ht cabinet <br />~~ copy <br />base cabinet <br />; wall cabinet <br />28,279 sf 0.10 2,828 2,828 0 <br />_ __-- __ _ _ _ --- - - . <br />2,828 2,828 0 <br />1 sum 0.00 0 l 0 ~ 0 ~NIC <br />-___ _. OI 0 0 <br />plastic laminate <br />14.5 If 165.00 2,393 2,393 0 <br />14.5 If 85.00 1,233 1,233 0 <br />6.0 If 75.00 450 450 0 <br />8.0 If 275.00 2,200 2,200 0 <br />14.0 If 165.00 2,310 2,310 0 <br />12.0 If 275.00 3,300 3,300 0 <br />7.5 If 165.00 1,238 1,238 0 <br />14.0 If 85.00 1,190 1,190 0 <br />Third Floor Tenant Improvements Detail Estimate - Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.