Laserfiche WebLink
~Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />Third Floor <br />Total Area <br />Third Floor Tenant Finishes <br />_ __ _ _ _ - - - _- -- ___ _ _ _ _ -- <br />Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98 <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Portland, Oregon 97221 Print Time: 11:42 AM <br />Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />_ _ - - - __ _ _ -- - <br />28,279 <br />. -- 28,279 sf sf <br />- - - - - - _ _- <br />Quantity _ Unit CosUUrnt Cost Total Comments <br />WOOD & PLASTICS - Continued <br />Casework - Continued <br />support enforcement <br />base cabinet 4.0 If 165.00 <br />wall cabinet 4.0 If 85.00 <br />wait / reception <br />counter 9.0 If 275.00 <br />storage / workroom i <br />base cabinet I 42.5 If 165.00 <br />wall cabinet ', 14.0 If 85.00 <br />waiting <br />through-wall counter ! 7.0 If 75.00 _ <br />Subtotal <br />- - <br />, TOTAL - WOOD 8~ PLASTICS _ _ - - - -- - --- ----_ _ <br /> <br />MOISTURE - THERMAL CONTROL <br />_ - _ ----- , __ <br /> <br />_ __ _ <br /> <br />- -- - __ .__-- <br /> <br />- - <br />I <br />Firesafing ~ <br />allowance 28,279 sf 0.02 <br />Subtotal <br />Caulking & Sealants <br />660 <br />340 <br />2,475 <br />7,013 <br />1,190 <br />525 <br />26, 515 <br />____. _ _529,343 <br />500 <br />- __ __ _- -- <br />500 <br />caulking / sealants 28,279 sf 0.07 1,980 __ <br />Subtotal ~ 1,980 <br />-_ <br />~ TOTAL - MOISTURE - THERMAL CONTROL ~2,480 <br />660 0 <br />340 0 <br />2,475 0 <br />7,013 0 <br />1,190 0 <br />525 0 <br />6,515 0 0.94 <br />9,343 $0 ___ __ 1.04 <br />500 0 <br />500 0 <br />1,980 0 <br />1,980 0 <br />2,480 $0 - _ _ 0.09 _ _ <br />Third Floor Tenant Improvements Detail Estimate - Page 2 <br />~ <br />