My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Analysis and Feasibility Report (2)
>
CS_Courthouse Square
>
Project Analysis and Feasibility Report (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:44:22 PM
Creation date
9/6/2011 10:43:49 AM
Metadata
Fields
Template:
Building
RecordID
10308
Title
Project Analysis and Feasibility Report
Company
Gardiner & Glancy LLC
BLDG Date
7/1/1996
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9601 Courthouse Square Research
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Arbuckle Costic work sheets <br />Courthouse Square # 9G37 Septunber 30, 1996 <br />Staffing Analysis- Randy Curtis <br />Dcnt• Staff T~-nc <br />• Board of Comm. 17 (3 wmm.; 1 dept. hd., 3 managei-s: 10 supp.) <br />• Child. & Families ( (1 manager; ~ ~uPP~) <br />• Legal Coun.~l 8 ( l dePt. hd.; ~ attome~~s: 2 supP.) <br />• Generai Service~ 19 (1 dept. hd., 3 managers; 1~ supp.) <br />• F'ixal Se~l~ices l0 (~ managei-s, 7 support) <br />• Risk Management S ( l dept. hd., 1 manager, 6 supp.) <br />• Solid Waste 12 (! dept. hd., 1 manager, 3 engineers, 7 supp.) <br />• Pul,lic Woi-ks /~dmin. 4 (4 supp.) <br />• CD- Ylanning I 1 ( I dept. hd.: 2 manager~; 8 supp.) <br />• CD- [3uilding [n:P~~c;t. 27 { ~ -uanager~: 9 inspectors, I ~ suPP ) . <br />• CD- I ~ousing Auth. l8 (> >taY~ in field) <br />• Misa:llancou> ; (Undetineci)- Toda~°'s Choic;es/Neigh. "I~o Neigh. <br /> 14~ emrl. <br />Futuro <br />• C1erlJRccx>rd, I! (1 electcd oit~., 1 manager; 9 supp.) <br />• A;;~,~sor G i ( I elected o8~.: 6 managei:s, ~6 supp.) <br />• 1~aJ(~rcas. 9 ( I elcctui ofl~., 1 manager; 7~uPP.) <br /> K; ~mpl. <br />*Sup~.= (cle~u»es srrppor~ sli~jjincludin~>; speciulis~s, ~cchnicians. c(ericn/, elc.j <br />Fiscal Sen'ices: <br />• Mix of Pri~-ate and oTx;n olliccs. Approximatelv G oP~n odic;e units ~~rith upper shelv~s etc. Will tx mo~~ing to <br />ne~i huilding ~vith stall: Mau~'e color ~~~ith oak trim. <br />• C~rc;atcst ne~d is ~or tiling. There are 20+ (~ dra~~~er) tiling cabine~~ in addition to a 7'~G ~vall unit tor tile,. 2G <br />boxes for lilc;s on flex~r. Thcre is a n~~ for a room/table lo do re~arch. The L~oxes of lil~ are the result of <br />re.e:u-ch and nc~d to l~ x~me~i~here in of~ice ~vhere staf~can easilv access. <br />• t~ c;onterence tahle ezis~~ prz~ently ~;fiieh is useci for a'~nall staff meetings and as a plac;e to do r~arch. <br />Gcneral Sen•ices: <br />/nc/rr~les: Hu~nan Ilesou~ ces, Prr~ chnsing and A1ni/ (Pu~ chasing af~d Alai! in difje~ ent loca[ion) <br />- Reception for Gcn. ~iv. is al~ an info~mation line that handles many phone calls, it also acts as reception for <br />Fixal. The lobby spac;e in reception is vei~~ ~acious now and really only needs space for 3-4 people at a time_ <br />• The ~vorl: space (de~k unit) for reception ~vill be moving and is a blue color with oal: trim. <br />• The existing conference rc~om is suitable f~r 10-12 people and is shared by other floors. Fumishings are <br />cranbem~ colored_ <br />• The existing work room is app. 10'x 12' and is u~ed for fax, copying, supplies, etc. this area can be shared with <br />adjacent departments and needs to be em;lo~d for noise protection. <br />~; X <br />~$ ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.