~ ~ ~
<br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R18-Aug-98
<br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98
<br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98
<br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 05:44 PM
<br />Desf n Develo ment Probable Cost Estimate Phone 503) 297-7210 Fax 503 297-7187 Construction Start: S ring 99
<br />
<br />Ground Level 23,249
<br />Second Floor 32,088
<br />32,088
<br />Third Floor
<br />Fourth Floor 32,088
<br />D RA F T
<br />FiRh Floor 32,012
<br />Penthouse 1,818
<br />Total Gross Aroa 153,343 sf
<br />Buildin Shell 8 Core Quanti Unit CosUUnit Cost Total Comments
<br />
<br />FINISHES - Continued
<br />Gypsumboard Systems - Continued
<br />acoustic @ above 32,640 sf 0.65 21,216 ,21,216' verify
<br />furring @ concrete wall 4,270 sf 2.25 9,608 9.6os
<br />@ cmu @ gmd flr windows 674 sf 5.00 3,370 ' 3,370'
<br />suspended gypboard ceiling systems
<br />suspended gypboard ceiling systems 4,784 sf 3.75 17,940 t~,9a0
<br />stairs 0 sf 0.00 0 0' NIC - exposed
<br />fascia 108 sf 7.00 756 75s
<br />Subtotal 477,311 a o 0 o a~7,3a't
<br />Ceilings
<br />2 x 2 ACT 1,122 sf 2.50 2,805 2,805
<br />2 x 4 ACT 6,777 sf 1.75 11,860 11,860
<br />supply stock on floor 108,816 sf 1.15 125,138 125,~38' installed w/ tenant fit-up
<br />install hanging wire only 108,816 sf 0.07 7,617 7,617
<br />penthouse 1,818 sf 0.00 0 o NIC
<br />Subtotal 147,420 0 0 ' o a ta7,42o
<br />Soffits - EIFS
<br />@ bay windows 241 sf 8.00 1,924 1,s2a
<br />@ receiving dock / parking ramp 3,367 sf 6.00 20,202 20,202
<br />second floor bldg overhang 6,658 sf 6.00 39,948 39,9as
<br />Subtotal 62,074 0 0 0 0 62,o7a
<br />Ceramic Tile
<br />floor tile
<br />_
<br />_
<br />type A 2,227 sf 9.25 20,600 2o,soo
<br />type g 64 sf 25.00 1,600 t,soo
<br />type C 66 sf 45.00 2,970 2,970
<br />type D 74 sf 9.00 666 666
<br />type E 1,740 sf 9.75 16,965 ~6,ss5
<br />Building Shell & Core Detail Estimate - Page 11
<br />
|