,
<br />~
<br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R18-Aug-98
<br />Court 8 High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98
<br />Oregon
<br />Salem 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98
<br />,
<br />Arbuckle Costic Architeds, Inc Portland, Oregon 97221 Print Time: 05:44 PM
<br />Desi n Develo ment Probable Cost Estimate Phone (503) 297-7210 Fax 503) 297-7187 Construction Start: S rin 99
<br />Ground Level 23,249
<br />32
<br />088
<br />,
<br />Second Floor
<br />rn~ro Fi~~ p RAFT as,oea
<br />32,088
<br />Fourth Floor
<br />012
<br />32
<br />'
<br />,
<br />dth Floor
<br />F
<br />~
<br />818
<br />Penthouse
<br />'
<br />Total Gross Area 153,343 sf
<br />Buildin Shell 8~ Core Quanti Unit CosUUnit Cost Total Comments
<br />
<br />FINISHES - Continued
<br />Ceramic Tile - Continued
<br />base
<br />tyPe q
<br />564 If 12.00 6,768
<br />s,768
<br />'
<br />tyPe E 584 If 10.75 6,278 s,2~s
<br />wall tile
<br />type A 2,602 sf 8.50 22,117 22,~»
<br />type C 1,021 sf 45.00 45,945 a5,sa5
<br />exterior @ grnd flr windows 674 sf 10.00 6,740 6,740
<br />Subtotal 130,649 0 0 0' o t30,64s
<br />Resilient
<br />~~ 2,506 sf 1.75 4,386 a,386
<br />rubber base 2,679 If 1.50 4,019 ~,019
<br />Subtotal 8,404 '~0 SO '' SO' ~0 58,404
<br />Carpet
<br />type 4
<br />23.8 sy 42.00 1,000
<br />1,000
<br />tyPe 7 84.0 sy 36.00 3,024 3,024
<br />e g
<br />t 459.2 sy 18.65 8,564 8,5sa
<br />yP
<br />Subtotal 12,588 ~0 30 ' $0' 30 a12,588
<br />Paint & wallcoverings
<br />sealed conc. floor
<br />transformer room 722 sf 0.35 253 253
<br />tenant areas 108,816 sf 0.35 38,086 38,o8s
<br />retail area 3,582 sf 0.50 1,791 ~""` ",.." "' "' ` ~>>`~
<br />penthouse 1,692 sf 0.35 592 592
<br />paint / finish door & frame 113 ea 60.00 6,780 8~780
<br />paint / finish relite frame 25 ea 40.00 1,000 ~,ooo
<br />paint gypboard ceilings 4,784 sf 0.60 2,870 2~~~~
<br />paint fascia 108 sf 0.65 70 ~~
<br />paint exterior soffits 10,266 sf 0.65 6,673 6,673
<br />Building Shell & Core Detail Estimate - Page 12
<br />
|