~ ~ ~
<br />Courthouse Square
<br />COUR & Hlgh St~eet
<br />Salem, Oregon
<br />Arbuckle Costic Architects, Inc Architectural Cost Consultants, LLC
<br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA
<br />6441 SW Canyon Court, Suite 103
<br />Portland, Oregon 97221 Estimate Date: R18-Aug-98
<br />Document Date: 23-Ju1-98
<br />Print Date: 18-Aug-98
<br />Print Time: 05:44 PM
<br />Desi n Develo ment Probable Cost Estimate Phone 503 297-7210 Fax 503) 297-7187 Construction Start: Spring 99
<br />
<br />Ground Level
<br />Second Fioor
<br />Third Floor p ~F.r
<br />Fourth Ftoor
<br />Fifth Floor
<br />Penthouse
<br />Totel Gross Area 23,249
<br />32,088
<br />32,088
<br />32,088
<br />32,012
<br />~~818
<br />153,343 sf
<br />Buildin Shell & Core Quanti Unit CosUUnit Cost Total Comments
<br />
<br />FINISHES - Continued
<br />Paint & wallcovering - Continued
<br />paint walls
<br />walls
<br />15,688
<br />sf
<br />0.45
<br />7,060
<br />~.~o
<br />prime only @ tenant area
<br />stair well 30,782
<br />6,780 sf
<br />sf 0.15
<br />0.65 4,617
<br />4,407 4,6~7
<br />4;40~
<br />paint exposed
<br />paint steel stairs
<br />brick sealer
<br />7,788
<br />37,717 sf
<br />sf
<br />sf 0.00
<br />0.75
<br />0.45 0
<br />5,841
<br />16,973 o
<br />5.8~'-'
<br />~6,s73 NIC
<br />miscellaneous specialty painting 1 sum 3,500.00 3,500 3,500
<br />wall covering
<br />type 1& 2
<br />21,694
<br />sf
<br />1.50
<br />32,541 '
<br />32,5a~
<br />Subtotal 133,053 0 0 0 0 133,053
<br />
<br />TOTAL - FINISHES ~971,499 ' SD ' $o ' a0' SO ~s71;499 6.34
<br />SPECIALTIES
<br />
<br />Toilet partitions - plastic laminate, ceiling ung
<br />ADA 8 ea 690.00 5,520 5,520
<br />standard 16 ea 575.00 9,200 9,200
<br />urinal screen 4 ea 250.00 1,000 1,000
<br />Subtotal 15,720 ~0 So ' a0 $0 3~5,720
<br />Louvers
<br />wall louvers 800 sf 30.00 24,000 2a,o00 allowance - verify (not shown
<br />Subtotal 24,000 °' ~0 ~0 S~ SO 324;000'
<br />Signage Systems
<br />directories 1 sum 1,500.00 1,500 i,5oo
<br />signage 153,343 sf 0.00 0 0 NIC w/ tenant
<br />Subtotal 1,500 So S0 ' 3o SO 51,500
<br />Building Shell & Core Detail Estimate - Page 13
<br />
|