<br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R18-Aug-98
<br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98
<br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98
<br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 05:44 PM
<br />Desi n Develo ment Probable Cost Estimate Phone 503 297-7210 Fax 503 297-7187 Construction Start: Spring 99
<br />
<br />Ground Level 23,249
<br />Second Floor 32,088
<br />Third Floor D Rp F T 32,088
<br />32,088
<br />rth Fl
<br />F
<br />oor
<br />ou
<br />Fifth Floor 32,012
<br />Penthouse ~~618
<br />Total Gross Area 153,343 sf
<br />Buiidin Shell 8 Core Quanti Unit CosUUnit Cost Total Comments
<br />
<br />SPECIALTIES - Continued
<br />Fire extinguisher & cabinets
<br />FEC 12 ea 250.00 3,000 3,000 verify
<br />Subtotal 3,000 SO SQ 50': SO a3,0o0
<br />Toilet accessories (inds installation)
<br />`
<br />grab bars 8 sets 135.00 1,080 1,oeo
<br />mirrors ea 185.00 0 o
<br />' see glazing above
<br />paper towel dispnsr / recpt 8 ea 325.00 2,600 2,600
<br />janitor tool holder 4 ea 80.00 320 320
<br />sanitary napkin dispenser 4 ea 375.00 1,500 ~,500
<br />sanitary napkin disposal 16 ea 38.00 608 so8
<br />hooks 24 ea 15.00 360 360
<br />purse sheff 16 ea 55.00 880 880
<br />toilet paper dispenser 24 ea 50.00 1,200 1,200
<br />seat cover dispenser 24 ea 65.00 1,560 ~,560
<br />soap dispenser 16 ea 45.00 720 720
<br />Subtotal 10,828 0 0 0 0 10,828
<br />Window Washing Equipment
<br />tie backs & roof anchors
<br />swing stage 1 sum 15,000.00 15,000 ~5,000
<br />,
<br />Subtotal 15,000 ;0 S0, ~0 ao 575,000
<br /> '
<br />TOTAL - SPECIALTIES ~70,048 ' 30 ' ~~! ~o SO 'S7o,o48 0.46
<br />EQUIPMENT
<br />Securiry / Vault Equipment
<br />
<br />security system - basic bldg card access
<br />
<br />1 sum 72,000.00 72,000
<br />
<br />~
<br />'
<br />'~2,~0'tl'
<br />atlowance er ACA
<br />P
<br />Subtotal
<br />Loading Dock Equipment
<br />dock bumpers 72,000
<br />
<br />1 sum 500.00 500 ~0
<br />
<br />16 $o
<br />
<br />_ 358. SD $o ~22,000
<br />
<br />~25
<br />Subtota~ 500 ~i6 ', ~358 EO ,a0 5125'
<br />TOTAL - EQUIPMENT ~72,500 S16 5358, So a0 372,125 0.47
<br />- - --_ ~
<br />Building Shell & Core Detail Estimate - Page 14
<br />
|