Laserfiche WebLink
~ ~ ~ <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R18-Aug-98 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 05:44 PM <br />Desi n Develo ment Probable Cost Estimate Phone 503 297-7210 Fax 503 297-7187 Construction Start: Spring 99 <br /> <br />Ground Level 23,249 <br />Second Floor 32,088 <br />Third Floor D Rp F T 32,088 <br />32,088 <br />rth Fl <br />F <br />oor <br />ou <br />Fifth Floor 32,012 <br />Penthouse ~~618 <br />Total Gross Area 153,343 sf <br />Buiidin Shell 8 Core Quanti Unit CosUUnit Cost Total Comments <br /> <br />SPECIALTIES - Continued <br />Fire extinguisher & cabinets <br />FEC 12 ea 250.00 3,000 3,000 verify <br />Subtotal 3,000 SO SQ 50': SO a3,0o0 <br />Toilet accessories (inds installation) <br />` <br />grab bars 8 sets 135.00 1,080 1,oeo <br />mirrors ea 185.00 0 o <br />' see glazing above <br />paper towel dispnsr / recpt 8 ea 325.00 2,600 2,600 <br />janitor tool holder 4 ea 80.00 320 320 <br />sanitary napkin dispenser 4 ea 375.00 1,500 ~,500 <br />sanitary napkin disposal 16 ea 38.00 608 so8 <br />hooks 24 ea 15.00 360 360 <br />purse sheff 16 ea 55.00 880 880 <br />toilet paper dispenser 24 ea 50.00 1,200 1,200 <br />seat cover dispenser 24 ea 65.00 1,560 ~,560 <br />soap dispenser 16 ea 45.00 720 720 <br />Subtotal 10,828 0 0 0 0 10,828 <br />Window Washing Equipment <br />tie backs & roof anchors <br />swing stage 1 sum 15,000.00 15,000 ~5,000 <br />, <br />Subtotal 15,000 ;0 S0, ~0 ao 575,000 <br /> ' <br />TOTAL - SPECIALTIES ~70,048 ' 30 ' ~~! ~o SO 'S7o,o48 0.46 <br />EQUIPMENT <br />Securiry / Vault Equipment <br /> <br />security system - basic bldg card access <br /> <br />1 sum 72,000.00 72,000 <br /> <br />~ <br />' <br />'~2,~0'tl' <br />atlowance er ACA <br />P <br />Subtotal <br />Loading Dock Equipment <br />dock bumpers 72,000 <br /> <br />1 sum 500.00 500 ~0 <br /> <br />16 $o <br /> <br />_ 358. SD $o ~22,000 <br /> <br />~25 <br />Subtota~ 500 ~i6 ', ~358 EO ,a0 5125' <br />TOTAL - EQUIPMENT ~72,500 S16 5358, So a0 372,125 0.47 <br />- - --_ ~ <br />Building Shell & Core Detail Estimate - Page 14 <br />