Laserfiche WebLink
~ ~ ~ <br />Courthouse Square <br />Court 8 High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Desi n Develo ment Probable Cost Estimate Architectural Cost Consultants, LLC <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portland, Oregon 97221 <br />Phone 503) 297-7210 Fax 503 297-7187 Estimate Date: R18-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 18-Aug-98 <br />Print Time: 05:44 PM <br />Construction Start: Spring 99 <br /> <br />Ground Level 23,249 <br />Second Floor 32,088 <br />Third Floor D RA F T 32~088 <br />Fourth Floor 32,088 <br />Fifth Floor 32,012 <br />Penthouse ~~818 <br />Total Gross Area 153,343 sf <br />Buildin Shell 8 Core Quanti Unit CosUUnit Cost Total Comments <br /> <br />FURNISHINGS <br />Window treatment <br />@ relites & sidelites <br />windows <br />curtain wall <br />350 sf 3.00 1,050 <br />11,008 sf 3.00 33,024 <br />3,038 sf 3.00 9,114 <br />1,050 <br />33,02a <br />s,~~a <br /> <br /> <br />erify <br />Subtotal <br />Floor Mats & Frames <br />Walk-off mat 43,188 <br /> <br />96 sf 30.00 2,880 ' SO ' So So' $0 Sa3.~88 <br /> <br />2,88o <br /> <br />vestibule only <br />Subtotal 2,880 '~0 3fl ' SO' 'ao ` 52,aso <br />TOTAL - FURNISHINGS 546,068 SO SO SO 30 $a6,068 0.30 <br /> <br />SPECIAL CONSTRUCTION <br />Item sf 0.00 0 0 <br />Subtotal 0 ~0 S~ ' SO' $o So <br />TOTAL - SPECIAL CONSTRUCTION ~0 a0 30 " S0 3o So 0.00 <br /> <br />CONVEYING SYSTEMS <br />Pssngr elevator 3000# geared - 350 fpm <br />Cab finishes <br />premium for extended cab ht. 15 stop 20,500.00 307,500 <br />3 ea 6,000.00 18,000 <br />1 sum 1,800.00 1,800 30~,500 <br />~8,000 <br />1,soo <br />Subtotal 327,300 ao a0 Eo' $o ~327;300 <br />TOTAL - CONVEYING SYSTEMS $327,300 ' S0 a0 ' SO' 30 3327,300 2.13 <br />Building Shell & Core Detail Estimate - Page 15 <br />