~ ~ ~
<br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R18-Aug-98
<br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98
<br />Salem, Oregon 6441 SW Canyon CouR, Suite 103 Print Date: 18-Aug-98
<br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 05:44 PM
<br />Design Development Probable Cost Estimate Phone 503) 297-7210 Fax 503 297-7187 Construction Start: Spring 99
<br />
<br />Ground Level 23,249
<br />Second Floor 32,068
<br />T~,~ F,~~ D RA F T 3z.oa8
<br />Fourth Floor 32,088
<br />Fifth Floor 32,012
<br />Panthouse ~~818 I
<br />Total Gross Area 153,343 sf
<br />Buildin Shell 8~ Core Quanti Unit CosUUnit Cost Total Comments
<br />
<br />MECHANICAL -
<br />
<br />HVAC '
<br />basic materials 8~ methods 153,343 sf 1.00 153,343 153,343
<br />boiler & heating water system ~
<br /> sf 0.00 0
<br />central air handling & fan system
<br />ac-1 8~ 2- 90 ton 180 ton 1,075.00 193,500 t93,500
<br />ac-3 - 130 ton 130 ton 970.00 126,100 t26100
<br />ac-4 - 25 ton 25 ton 1,200.00 30,000 ' 30,000
<br />air distribution
<br />mp ductwork & insulation 128,150 cfm 3.00 384,450 384,d50
<br />slot diffusers 27 ea 300.00 8,100 s,~oo
<br />square diffusers 89 ea 200.00 17,800 ~z,8oo
<br />retum air grilles 29 ea 100.00 2,900 ' 2,90~'
<br />terminal & package units
<br />VAV FP terminal unit, elect reheat 45 ea 1,200.00 54,000 5d,4oo
<br />TU 115 ea 1,000.00 115,000 115,000
<br /> 0
<br />controls 153,343 sf 1.25 191,678 ~91,678
<br /> 0
<br /> 0
<br />balancing 153,343 sf 0.50 76,671 7s;s7~
<br /> 0
<br />remainder undefined 153,343 sf 1.25 191,678 ~. -. -:::I9a.,67a .
<br />Subtotat 1,545,220 0 0 0 0 1,545,220 10.08
<br />Building Shell & Core Detail Estimate - Page 16
<br />
|