Laserfiche WebLink
~ ~ ~ <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R18-Aug-98 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon CouR, Suite 103 Print Date: 18-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 05:44 PM <br />Design Development Probable Cost Estimate Phone 503) 297-7210 Fax 503 297-7187 Construction Start: Spring 99 <br /> <br />Ground Level 23,249 <br />Second Floor 32,068 <br />T~,~ F,~~ D RA F T 3z.oa8 <br />Fourth Floor 32,088 <br />Fifth Floor 32,012 <br />Panthouse ~~818 I <br />Total Gross Area 153,343 sf <br />Buildin Shell 8~ Core Quanti Unit CosUUnit Cost Total Comments <br /> <br />MECHANICAL - <br /> <br />HVAC ' <br />basic materials 8~ methods 153,343 sf 1.00 153,343 153,343 <br />boiler & heating water system ~ <br /> sf 0.00 0 <br />central air handling & fan system <br />ac-1 8~ 2- 90 ton 180 ton 1,075.00 193,500 t93,500 <br />ac-3 - 130 ton 130 ton 970.00 126,100 t26100 <br />ac-4 - 25 ton 25 ton 1,200.00 30,000 ' 30,000 <br />air distribution <br />mp ductwork & insulation 128,150 cfm 3.00 384,450 384,d50 <br />slot diffusers 27 ea 300.00 8,100 s,~oo <br />square diffusers 89 ea 200.00 17,800 ~z,8oo <br />retum air grilles 29 ea 100.00 2,900 ' 2,90~' <br />terminal & package units <br />VAV FP terminal unit, elect reheat 45 ea 1,200.00 54,000 5d,4oo <br />TU 115 ea 1,000.00 115,000 115,000 <br /> 0 <br />controls 153,343 sf 1.25 191,678 ~91,678 <br /> 0 <br /> 0 <br />balancing 153,343 sf 0.50 76,671 7s;s7~ <br /> 0 <br />remainder undefined 153,343 sf 1.25 191,678 ~. -. -:::I9a.,67a . <br />Subtotat 1,545,220 0 0 0 0 1,545,220 10.08 <br />Building Shell & Core Detail Estimate - Page 16 <br />