Laserfiche WebLink
~ ~ ~ <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R18-Aug-98 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 05:44 PM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br /> <br />Parking Level One 70,793 <br />Gross Area 70,793 sf <br />Parkin Quanti Unit CosUUnit Cost Total Comments <br /> <br />SITE WORK - Continued <br />2" sand under slab 21 cy 25.00 525 525 @ strg rm & elevtr Ibby only <br />perimeter drain system <br />6" pvc drain pipe 1,116 If 7.00 7,812 7,812 <br />rock 441 cy 18.00 7,938 7,938' <br />filter fabric 13,094 sf 0.35 4,583 4,583 <br />Subtotal $280,899 $0 $0 $28t3,899 <br />TOTAL - SITE WORK ~280,899 $0 $a " $280,899 3.97 <br />CONCRETE <br />Poured-in-place concrete <br />forming <br />spread footings 2,480 sf 4.85 12,028 12,028' <br />continuous footing 3,408 sf 4.75 16,188 16,188 <br />ramp wall 138 sf 475 656 656 <br />sfab on grade 113,538 sf 0.50 56,769 56,769> <br />columns 2,268 sf 5.75 13,041 13,041 <br />walls <br />basement 24,233 sf 5.35 129,647 129,647' <br />ramp wall 1,472 sf 5.35 7,875 7,875" <br />beams sf 6.50 0 0 NIC <br />supported slab 70,103 sf 4.50 315,464 'f57,'732 1~7,732 0 <br />parking ramp 2,254 sf 4.50 10,143 10,143 <br />drop panel sf 7.25 0 0 NIC <br />topping slab <br />3" @ drive lane 14,356 sf 0.35 5,025 5,025 <br />3" It weight 24,728 sf 0.35 8,655 ° °~ .'' -8;855 <br />3" ~ building plaza 7,988 sf 0.40 3,195 3,195 <br />curbs sf 6.50 0 0 <br />Subtotal - Forming 578,684 ~f 57,732 157,732 263,221 <br />Parking Detail Estimate - Page 2 <br />