Laserfiche WebLink
~ ~ ~ <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R18-Aug-98 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98 <br />Arbudcle Costic Architects, Inc Portland, Oregon 97221 Print Time: 05:44 PM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br /> <br />Parking Level One 70,793 <br />Gross Area 70,793 sf <br />Parkin Quanti Unit CosUUnit Cost Total Comments <br /> <br />M ETALS <br />Miscellaneous metals <br />steei stair 36 risers 105.00 3,780 3,7$0 <br />stair landing 408 sf 30.00 12,240 1'2,240 <br />railings <br />stair guardrail 60 If 55.00 3,300 3,300'' <br />stair wall rail 56 If 30.00 1,680 1,,680 <br />miscellaneous (embeds, etc.) 70,793 sf 0.20 14,159 14,159 <br />Subtotal 35,159 0 0° 35,159 <br />TOTAL - METALS ~35,159 $0 $U $3~,159 0.50 <br /> <br />WOOD & PLASTICS <br />Rough carpentry <br />miscellaneous blocking 1 sum 500.00 500 500' <br />Subtotal 500 0' 0' 500 <br />TOTAL - WOOD & PLASTICS ~500 $0 $0 $500 0.01 <br /> <br />MOISTURE - THERMAL CONTROL <br />Waterproofing & Damproofing <br />underslab waterproofing 6,050 sf 2.75 16,638 1'6;638 per CWEC <br />waterprooffoundationwalls 11,903 sf 3.00 35,709 35,709 <br />Subtotal 52,347 0 0' 52,347 <br />Traffic Coating <br />entry ramp 1,238 sf 3.00 3,714 3,714 verify <br /> <br />parking level <br />88,354 sf 0.00 0 <br />0 I <br />NIC - verify <br />Subtotal 3,714 .', ,0 0. 3,714 <br />Insulation <br />Rigid insulation <br />roof R-19 0 sf 0.00 0 0 NIC - verify <br />exterior concrete wal~ R-11 0 sf 0.00 0 0; NIC - verify , <br />Subtotal 0 ' 0 0 0" i <br />Parking Detail Estimate - Page 6 <br />