Laserfiche WebLink
~ ~ ~ <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R18-Aug-98 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 05:44 PM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br /> <br />Parking Level One 70,793 <br />Gross Area 70,793 sf <br />Parkin Quanti Unit Cost/Unit Cost Total Comments <br /> <br />MOISTURE - THERMAL CONTROL - Conti ued <br />Flashing & Sheet Metal <br />miscellaneous 1 sum 3,000.00 3,000 3,000 <br />Subtotal 3,000 0 U 3,000 <br />Caulking & Sealants <br />caulking 70,793 sf 0.10 7,079 7,079 <br />Subtotal 7,079 0 0 7,079' <br />TOTAL - MOISTURE - THERMAL CONTROL a66,140 $0 $U $66,140- 0.93 <br /> <br />DOORS, WINDOWS & GLASS <br />Doors <br />lobby 2 pair 2,800.00 5,600 5,600 <br />storage 3 pair 1,800.00 5,400 5,400 <br />single swing 3 ea 750.00 2,250 2,250 <br />stairs 4 ea 975.00 3,900 3,900 <br />Subtotal 17,150 0 0 17,150 <br />Overhead 8~ Coiling Grilles & Doors <br />rolldown gate @ ramp 286 sf 55.00 15,730 15,730 <br />overhead door @ storage 81 sf 15.00 1,215 1;215 <br />Subtotal 16,945 U 0 16,945 <br />TOTAL - DOORS, WINDOWS & GLASS ~34,095 $~ $0 $34,095' 0.48 <br />FINISHES <br />Gypsumboard Systems <br />item sf 0.00 0 .,. (~ <br />Subtotal 0 ' '0 0' 4 <br />Ceilings <br />I 2 x 4 ACT 478 sf 2.00 956 9~6 <br />~, Subtotal 956 Q 0 956 <br />Parking Detail Estimate - Page 7 <br />