My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Courthouse Square Costs (Notebook)
>
CS_Courthouse Square
>
Courthouse Square Costs (Notebook)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:06:45 AM
Creation date
9/6/2011 10:49:40 AM
Metadata
Fields
Template:
Building
RecordID
10323
Title
Courthouse Square Costs (Notebook)
Company
Architectural Cost Consultants
BLDG Date
8/1/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ _- _ ~ ~ <br />COUrthOUSe Square Architectural Cost Consultants LLC <br />~ ~ <br />Estimate Date: R18-Aug-98 <br />COU1t & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Can on Court, Suite 103 <br />Y <br />Print Date: 18-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 05:44 PM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />Parking Level One 70,793 <br />Gross Area 70,793 sf <br />Parkin Quanti Unit CosUUnit Cost Total Comments <br /> <br />MECHANICAL <br />HVAC <br />ventilation / exhaust system <br />ef-3 1 ea 2,800.00 2,800 '2 <br />80D assume 50000 cfm <br />ef-4 1 ea 2,800.00 2,800 , <br />2,800 assume 50000 cfm <br />dUCtwork 100,000 cfrn 1.35 135,000 ~~~rppp: <br />controls 2 ea 2,000.00 4,000 4,000 <br />balancing 1 sum 3,000.00 3,000 a~Qpp <br />Subtotal 147,600 ' :~ 0 147,600 2.08 <br />Plumbing <br />trench drain 25 If 60.00 1,500 1,500 I <br />underslab piping - 6" <br />S <br />bt <br />t <br />l 18 If 30.00 540 540 verify pipe size <br />u <br />o <br />a 2,040 0 0 2,040 0.03 <br />Fire sprinklers <br />dry system 70,793 sf 1.55 109,729 109,729 <br />Subtotal 109,729 0 0 1,09,729 1.55 <br />TOTAL - MECHANICAL ~259,369 $0 $0 $259,369 3.66 <br />Parking Detail Estimate - Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.