<br />Courthouse Square
<br />Court & High Street
<br />Salem, Oregon
<br />Arbuckle Costic Architects, Inc
<br />Design Development Probable Cost Estimate ACChitectural Cost Consultants, LLC
<br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA
<br />6441 SW Canyon Court, Suite 103
<br />Portland, Oregon 97221
<br />Phone (503) 297-7210 Fax (503) 297-7187 Estimate Date: R18-Aug-98
<br />Document Date: 23-Ju1-98
<br />Print Date: 18-Aug-98
<br />Print Time: 05:44 PM
<br />Construction Start: Spring 99
<br />
<br />Parking Level One
<br />Gross Area 70,793
<br />70,793 sf
<br />_
<br />Parkin Quanti Unit CosUUnit Cost Total Comments
<br />
<br />ELECTRICAL
<br />
<br />basic materials & power distribution
<br />lighting
<br />100 watt hps 12" surface mtd
<br />fire alarm
<br />snow melting @ ramp 70,793 sf 0.75 53,095
<br />
<br />70 fixt 435.00 30,450
<br />70,793 sf 0.40 28,317
<br />2,254 sf 18.00 40,572 53,095
<br />~
<br />30,450
<br />28,317'
<br />40 572
<br />Subtotal 152,434 0 0 ' 152,434
<br />TOTAL - ELECTRICAL $152,434 $0 $0 $152,434 2.15
<br />
<br />SUBTOTAL 2,570,580 ~2,570,580 4Dd,415 400,415 ' 1',769,749! $2,570,580
<br />
<br />GENERAL CONDITIONS
<br />GENERAL CONTRACTOR FEE
<br />ESTIMATING CONTINGENCY
<br />INDEX TO CONSTRUCTION START 7.75% 199,220
<br />3.75% 103,868
<br />4.50% 129,315
<br />Spring 99 0.75% 22,522 $454,925 31,032
<br />' 1E,179
<br />' 2t~,143
<br />3,508 31,032
<br />16,179
<br />20,143
<br />3,508 137',156
<br />' 71,S179
<br />'' 89,029
<br />15,506
<br />
<br />
<br />t 3% per year
<br />TOTAL DIRECT CONSTRUCTION COST
<br />Parking
<br />70,793 sf 542.74 /sf ~3,025,505
<br />$471,27'8
<br />$4'7'1,278
<br />$2,0$2,948
<br />$3,025,505
<br />Parking Detail Estimate - Page 11