Courtho~tise Square Architec~itral Cost Consultants, LLC Estimate Da`te: R18-Aug-98
<br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98
<br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98
<br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 05:44 PM
<br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99
<br />Ground Level
<br />Transit 6,572
<br />Transit / County 4,826
<br />County 2,532
<br />Total Area 13,930 sf
<br />Ground Level Tenant Finishes Quanti Unit CosUUnit Cost Total Comments
<br />SPECIAL CONSTRUCTION
<br />Item sf 0.00 0
<br />Subtotal 0 ' ' 0 ' 0
<br />TOTAL - SPECIAL CONSTRUCTION ~0 ! . $0 $0 0.00
<br />
<br />MECHANICAL
<br />HVAC
<br />county 6,572 sf 2.50 16,430 16,430
<br />country & transit 4,826 sf 2.50 12,065 6;033' 6,033
<br />transit 2,532 sf 2.50 6,330 6,330'
<br />Subtotal 34,825 ' 22,463 12,363 2.50
<br />Plumbing
<br />water closet
<br />transit 7 fixt. 1,975.00 13,825 13,$25
<br />shared 6 fi~. 1,975.00 11,850 5,925 5,925
<br />urinals 2 fixt. 1,825.00 3,650 3,650
<br />shared 1 fixt. 1,825.00 1,825 913 913
<br />lav sinks 8 fixt. 1,750.00 14,000 14,Q00'
<br />shared 7 fixt. 1,750.00 12,250 6,126- 6,125
<br />countersink 1 fixt. 1,900.00 1,900 '950 950
<br />shower 2 fixt. 2,100.00 4,200 4,200'
<br />
<br />shared
<br />2
<br />ea .
<br />1,200.00 ,
<br />2,400
<br />1,200 r
<br />1,200
<br />drinking fountain 1 ea 2,000.00 2,000 2,000
<br />water heater 1 ea 750.00 750 375 375
<br />Subtotal 73,450 1~;488 5"T,963' S.27
<br />Ground Level Tenant Improvements Detail Estimate - Page 12
<br />
|