Laserfiche WebLink
Courtho~tise Square Architec~itral Cost Consultants, LLC Estimate Da`te: R18-Aug-98 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 05:44 PM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />Ground Level <br />Transit 6,572 <br />Transit / County 4,826 <br />County 2,532 <br />Total Area 13,930 sf <br />Ground Level Tenant Finishes Quanti Unit CosUUnit Cost Total Comments <br />SPECIAL CONSTRUCTION <br />Item sf 0.00 0 <br />Subtotal 0 ' ' 0 ' 0 <br />TOTAL - SPECIAL CONSTRUCTION ~0 ! . $0 $0 0.00 <br /> <br />MECHANICAL <br />HVAC <br />county 6,572 sf 2.50 16,430 16,430 <br />country & transit 4,826 sf 2.50 12,065 6;033' 6,033 <br />transit 2,532 sf 2.50 6,330 6,330' <br />Subtotal 34,825 ' 22,463 12,363 2.50 <br />Plumbing <br />water closet <br />transit 7 fixt. 1,975.00 13,825 13,$25 <br />shared 6 fi~. 1,975.00 11,850 5,925 5,925 <br />urinals 2 fixt. 1,825.00 3,650 3,650 <br />shared 1 fixt. 1,825.00 1,825 913 913 <br />lav sinks 8 fixt. 1,750.00 14,000 14,Q00' <br />shared 7 fixt. 1,750.00 12,250 6,126- 6,125 <br />countersink 1 fixt. 1,900.00 1,900 '950 950 <br />shower 2 fixt. 2,100.00 4,200 4,200' <br /> <br />shared <br />2 <br />ea . <br />1,200.00 , <br />2,400 <br />1,200 r <br />1,200 <br />drinking fountain 1 ea 2,000.00 2,000 2,000 <br />water heater 1 ea 750.00 750 375 375 <br />Subtotal 73,450 1~;488 5"T,963' S.27 <br />Ground Level Tenant Improvements Detail Estimate - Page 12 <br />