Laserfiche WebLink
Courthb~.se Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Architec~rral Cost Consultants, LLC Estimate Da~e: R18-Aug-98 <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98 <br />Portland, Oregon 97221 Print Time: 05:44 PM <br />Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />Second Floor <br />Total Area 27,552 <br />27,552 sf <br />Second Floor Tenant Finishes Quanti Unit Cost/Unit Cost Total Comments <br /> <br />METALS <br />Miscellaneous metals <br />miscellaneous 27,552 sf 0.07 1,929 1,929 <br />Subtotal 1,929 0 1,929 <br />TOTAL - METALS 51,929 $0 ' $1,929 0.07 <br /> <br />WOOD & PLASTICS <br />Rough carpentry . <br />miscellaneous blocking & backing 27,552 sf 0.10 2,755 2,755 <br />Subtotal 2,755 ' 0 ' 2,755 <br />Finish carpentry <br />finish work - allowance 1 sum 0.00 0 0 NIC <br />Subtotal 0 0 A <br />Casework <br />break room (2) <br />base cabinet 17.5 If 165.00 2,888 2,888 <br />wall cabinet 11.5 If 85.00 978 978 <br />building inspect <br />36" wide public counter 51.0 If 275.00 14,025 14~025 <br />copy / rec <br />counter 32.0 If 90.00 2,880 2,880 <br />deeds <br />island base cabinet 21.0 If 250.00 5,250 5,250' <br />peninsula map cabinet 12.0 If . , ,, , <br />computer stations 12.0 If 90.00 1,080 '1,d80': <br />Subtotal 30,700 0 ' 3~,700' 1.11 <br />TOTAL - WOOD 8~ PLASTICS ~33,455 : $0 '$33,45~ 1.21 <br />Second Floor Tenant Improvements Detail Estimate - Page 1 <br />