Laserfiche WebLink
Courth~tic~r~e Square Architec~tral Cost Consultants, LLC Estimate Da~e: R18-Aug-98 <br />Court 8~ High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 05:44 PM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />Second Floor <br />Total Area 27,552 <br />27,552 sf <br />Second Floor Tenant Finishes Quanti Unit CosUUnit Cost Total Comments <br />MOISTURE - THERMAL CONTROL <br />Firesafing <br />allowance 27,552 sf 0.02 500 <br />Subtotal 500 ' 0 ' <br />Caulking & Sealants <br />caulking / sealants 27,552 sf 0.05 1,500 1; <br />Subtotal 1,500 ' ' ~ ` 1; <br />TOTAL - MOISTURE - THERMAL CONTROL ~2,000 $0 $2, <br />0.07 <br />DOORS, WINDOWS 8~ GLASS <br />Doors, Frames & Hardware (incls. installation <br />interior doors <br />office 8~ conf room 21 ea 750.00 15,750 "15,750 <br />other 9 ea 750.00 6,750 6,750' <br />Subtotal 22,500 ' ' 0 2~,500. <br />Relites, Sidelites & Transoms <br />relite sf 0.00 0 0 NIC <br />sidelite sf 0.00 0 0 NIC <br />Subtotal 0 0 0 <br />TOTAL - DOORS, WINDOWS & GLASS $22,500 $0 $22,500 0.82 <br /> <br />FINISHES <br /> <br />Partitions <br />typical partitions 9,288 sf 4.35 40,403 40,403 <br />furr columns 2,160 sf 3.50 7,560 7;56b <br />acoustic @ above 4,644 sf 0.65 3,019 3,019 verify <br />furring @ concrete wall 748 sf 2.25 1,683 1,683 <br />Subtotal 52,664 0 52;664 <br />Second Floor Tenant Improvements Detail Estimate - Page 2 <br />