Laserfiche WebLink
~ ~ ~ <br /> <br />Courthouse Square <br />Architectural Cost Consultants, LLC ~, ,- <br />Estimate Date: R18-Aug-98 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98 <br />Arbuckle Costic Architects, Inc PoRland, Oregon 97221 Print Time: 05:44 PM <br />Design Development Probable Cost Estimate Phone (503 297-7210 Fax (503 297-7187 Construction Start: S ring 99 <br />Ground Level 23,249 <br />Second Floor 32,088 <br />Third Floor p~ F T 32,068 <br />32,088 <br />rth Fl <br />F <br />oor <br />ou <br />Fifth Floor 32,012 <br />Penthouse ~ ~818 <br />Total Gross Area 153,343 sf <br />Buildin Shell 8 Core Quanti Unit Cost/Unit Cost Total Comments <br /> <br />CONCRETE <br /> <br />Poured-in-place concrete <br />forming <br /> <br />spread footings <br />4,780 sf 4.85 23,183 23,~s3 <br />mat footing 1,002 sf 5.50 5,511 5,511 <br />continuous footing sf 4.75 0 a see parking estimate <br />slab on grade sf 0.50 0 0 see parking estimate <br />columns <br />parking level 3,758 sf 5.75 21,609 21,609 <br />building 13,044 sf 5.75 75,003 75,003 <br />shear walls above parking level 26,927 sf 5.35 144,060 t4~,o60 <br />parking level 4,216 sf 5.35 22,555 1~,277 11,277 0 <br />' <br />elevator pit 836 sf 5.35 4,473 a,a73 <br />' <br />beams sf 6.50 0 o NIC <br />supported slab 154,284 sf 4.50 694,278 694.278 <br />drop panel sf 7.25 0 o NIC <br />curbs sf 6.50 0 ~ <br />Subtotal - Forming 990,671 11,27~ 11,2T1' 0 0 9B8,118 <br />reinforcing steel <br />spread footings 43,150 Ibs 0.46 19,849 19,~9 <br />mat footing 78,540 Ibs 0.46 36,128 3B,~2s <br />continuous footing Ibs 0.46 0 o see parking estimate <br />slab on grade Ibs 0.50 0 o see parking estimate <br />columns <br />parking level 27,227 Ibs 0.64 17,425 '8,~12 8,71z o <br />building 72,308 Ibs 0.64 46,277 4~+27~ <br />shear walls above parking level 106,040 Ibs 0.51 54,080 °° 5a,oso <br />parking level 16,600 Ibs 0.51 8,466 a,ass <br />elevator pit 3,449 Ibs 0.51 1,759 ~,~5s <br />beams NIC <br />post tension Ibs 3.50 0 0 <br />r/s Ibs 0.55 0 ~ <br />Building Shell & Core Detail Estimate - Page 2 <br />