Laserfiche WebLink
~ ~ ~ <br />Cou~'thouse Square Architectural Cost Consultants, LLC Estimate Date: R18-Aug-98 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98 <br />Arbuckle Costic Architects, Inc PoRland, Oregon 97221 Print Time: 05:44 PM <br />Desi n Develo ment Probable Cost Estimate Phone 503 297-7210 Fax (503 297-7187 Construction Start: S ring 99 <br /> <br />Ground Level 23,249 <br />Second Floor 32,088 <br />rnib Fi~~ p RA F T s2,osa <br />or 32,088 <br />rth Fl <br />F <br />ou <br />o <br />Fikh Floor 32,012 <br />Penthouse ~ ~81$ <br />Total Gross Area 153,343 sf <br />Buildin Shell & Core Quanti Unit CosUUnit Cost Total Comments <br /> <br />CONCRETE - Continued <br />R/S - Continued <br />supported slab ' <br />post tension (unbonded) 194,397 Ibs 2.15 417,954 a17,954 <br />r/s 218,705 Ibs 0.58 126,849 tzs,Ea9 <br />curbs Ibs 0.60 0 0 <br />Subtotal - Reinforcing Steel 728,787 s,~a2 8,~~2 0 0 7~~,362 <br />placing <br />spread footings 464 cy 18.00 8,352 8,352 <br />mat footing 409 cy 12.00 4,908 a,so8 <br />continuous footing cy 17.00 0 a ` see parking estimate <br />slab on grade cy 16.00 0 o see parking estimate <br />columns ~ <br />parking level 45 cy 32.00 1,440 ~.~o' <br />building 141 cy 32.00 4,512 , 4,512 <br />shear walls above parking level 691 cy 28.00 19,348 19,348 <br />parking level 123 cy 28.00 3,444 1.~22 1,72z ' o <br />elevator pit 24 cy 35.00 840 ~o <br />beams cy 45.00 0 0 NIC <br />supported slab 4,998 cy 16.00 79,968 79~~a <br />curbs 0 cy 50.00 0 0 <br />pumping 6,895 cy 10.00 68,950 815 6~5 sy,720 <br />Subtotal - Placing 191,762 2,33~ z,337' o o ' 18'l,ose <br />Building Shell & Core Detail Estimate - Page 3 <br />