<br />Courthouse Square
<br />Architectural Cost Consultants, LLC ..
<br />Estimate Date: R18-Aug-98
<br />Court 8 High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98
<br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98
<br />Arbuckle Costic Architects, Inc Portiand, Oregon 97221 Print Time: 05:44 PM
<br />Desi n Development Probable Cost Estimate Phone 503) 297-7210 Fax 503) 297-7187 Construction Start: S ring 99
<br />Ground Level 23,249
<br />Second Floor 32,088
<br />Third Floor p ~F.r 32,068
<br />32,088
<br />Fl
<br />oor
<br />Fourth
<br />FiRh Floor 32,012
<br />Penthouse 1, 618
<br />Total Gross Area 153,343 sf
<br />Buildin Shell 8~ Core Quanti Unit CosUUnit Cost Total Comments
<br />
<br />CONCRETE - Continued
<br />redi-mix concrete
<br />spread footings 3000 psi 464 cy 55.00 25,520 25,520'
<br />mat footing 3000 psi 409 cy 55.00 22,495 22,495
<br />continuous footing 3000 psi 0 cy 55.00 0 o see parking estimate
<br />slab on grade 4000 psi 0 cy 59.00 0 0 see parking estimate
<br />columns
<br />parking level 5000 psi 45 cy 65.00 2,925 2,925
<br />'
<br />'
<br />building 5000 psi 141 cy 65.00 9,165 s,165
<br />shear walls above parkin 5000 psi 691 cy 65.00 44,915 aa,915
<br />parking level 5000 psi 123 cy 65.00 7,995 3,998 ' 3,598 0
<br />'
<br />elevator pit 5000 psi 24 cy 65.00 1,560 ~,5so
<br />beams 5000 psi 0 cy 65.00 0 0
<br />supported slab 5000 psi 4,998 cy 65.00 324,870 32a,87o
<br />curbs 5000 psi 0 cy 65.00 0 0
<br />Subtotal - Redi-Mix Concrete 6,895 cy 439,445 3,598 3,998 0 o d31,450
<br />finishing
<br />set screeds 154,284 sf 0.20 30,857 3o,s5~
<br />cure 154,284 sf 0.08 12,343 ~2.3a3
<br />seal 154,284 sf 0.06 9,257 9,25~
<br />trowel 154,284 sf 0.60 92,570 s2,570
<br />float footings 9,064 sf 0.40 3,626 3,626
<br />break ties & plug voids @ walls 31,979 sf 0.55 17,588 1,15s 1,159 15,2~0
<br />Subtotal 166,241 ~,159 1,459 -, 0 0 163,922
<br />Architectural Precast Concrete
<br />below ground floor windows
<br />674 sf 0.00 0
<br />o
<br />change to 8" x 8" tile w/ cmu
<br />base @ building 8~ arcade columns 1,632 sf 40.00 65,280 65,280
<br />Subtotal 65,280 3o So So 30 3s5,2so
<br />
<br />TOTAL - CONCRETE $2,582,186 ffiz~,asa ~27,a8~ 30 $o $2.527,2~8 16.84
<br />Building Shell & Core Detail Estimate - Page 4