Laserfiche WebLink
~ ~ ~ <br />~,. <br />Courthouse Square <br />Architectural Cost Consultants, LLC .. <br />Estimate Date: R18-Aug-98 <br />Court 8 High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98 <br />Arbuckle Costic Architects, Inc Portiand, Oregon 97221 Print Time: 05:44 PM <br />Desi n Development Probable Cost Estimate Phone 503) 297-7210 Fax 503) 297-7187 Construction Start: S ring 99 <br />Ground Level 23,249 <br />Second Floor 32,088 <br />Third Floor p ~F.r 32,068 <br />32,088 <br />Fl <br />oor <br />Fourth <br />FiRh Floor 32,012 <br />Penthouse 1, 618 <br />Total Gross Area 153,343 sf <br />Buildin Shell 8~ Core Quanti Unit CosUUnit Cost Total Comments <br /> <br />CONCRETE - Continued <br />redi-mix concrete <br />spread footings 3000 psi 464 cy 55.00 25,520 25,520' <br />mat footing 3000 psi 409 cy 55.00 22,495 22,495 <br />continuous footing 3000 psi 0 cy 55.00 0 o see parking estimate <br />slab on grade 4000 psi 0 cy 59.00 0 0 see parking estimate <br />columns <br />parking level 5000 psi 45 cy 65.00 2,925 2,925 <br />' <br />' <br />building 5000 psi 141 cy 65.00 9,165 s,165 <br />shear walls above parkin 5000 psi 691 cy 65.00 44,915 aa,915 <br />parking level 5000 psi 123 cy 65.00 7,995 3,998 ' 3,598 0 <br />' <br />elevator pit 5000 psi 24 cy 65.00 1,560 ~,5so <br />beams 5000 psi 0 cy 65.00 0 0 <br />supported slab 5000 psi 4,998 cy 65.00 324,870 32a,87o <br />curbs 5000 psi 0 cy 65.00 0 0 <br />Subtotal - Redi-Mix Concrete 6,895 cy 439,445 3,598 3,998 0 o d31,450 <br />finishing <br />set screeds 154,284 sf 0.20 30,857 3o,s5~ <br />cure 154,284 sf 0.08 12,343 ~2.3a3 <br />seal 154,284 sf 0.06 9,257 9,25~ <br />trowel 154,284 sf 0.60 92,570 s2,570 <br />float footings 9,064 sf 0.40 3,626 3,626 <br />break ties & plug voids @ walls 31,979 sf 0.55 17,588 1,15s 1,159 15,2~0 <br />Subtotal 166,241 ~,159 1,459 -, 0 0 163,922 <br />Architectural Precast Concrete <br />below ground floor windows <br />674 sf 0.00 0 <br />o <br />change to 8" x 8" tile w/ cmu <br />base @ building 8~ arcade columns 1,632 sf 40.00 65,280 65,280 <br />Subtotal 65,280 3o So So 30 3s5,2so <br /> <br />TOTAL - CONCRETE $2,582,186 ffiz~,asa ~27,a8~ 30 $o $2.527,2~8 16.84 <br />Building Shell & Core Detail Estimate - Page 4 <br />