Laserfiche WebLink
Courth se Square Archite n'ral Cost Consultants, LLC <br />Court 8 High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (5031297-7187 <br />Estimate C~e: R1&Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 18-Aug-98 <br />Print Time: 05:44 PM <br />Construction Start: Sarina 99 <br />Thfrd Floor <br />Total Area 28,279 <br />28,279 sf <br />sf <br />Third Fioor Tenant Finishes Quanti Unit CosUUnit Cost Total Comments <br /> WOOD 8~ PLASTICS <br /> Rough carpentry <br /> miscellaneous blocking & backing 28,279 sf 0.10 2,828 2,828 <br /> Subtotal 2,828 0 2,828 <br /> Finish carpentry <br /> item 1 sum 0.00 0 0' NIC <br /> Subtotal 0 0' 0 <br /> Casework plastic laminate <br /> break room <br /> base cabinet 14.5 If 165.00 2,393 2,393 <br /> wall cabinet 14.5 If 85.00 1,233 't,233'' <br /> wait / reception <br /> through-wall counter 6.0 If 75.00 450 450 <br /> counter 8.0 If 275.00 2,200 2,200 <br /> work / copy / file <br /> base cabinet 14.0 If 165.00 2,310 2,3,10 <br /> victim assistance <br />„ • <br /> <br />copy . . , ~: <br /> base cabinet 7.5 If 165.00 1,238 1,238 <br /> wall cabinet 14.0 If 85.00 1,190 1,1'90 <br />Third Floor Tenant Improvements Detail Estimate - Page 1 <br />