Laserfiche WebLink
CourtH'~use Square Archite~tural Cost Consultants, LLC Estimate a~e: R18-Aug 98i <br />Court 8 High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 1&Aug-98 '' <br />Art~uckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 05:44 PM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />Third Floor <br />Total Area 2g,27g <br />28,279 sf <br />sf <br />Third Floor Tenant Finishes Quanti Unit CosUUnit Cost Total Comments <br />WOOD & PLASTICS - Continued <br />Casework - Continued <br />support enforcement <br />base cabinet 4.0 If 165.00 660 ~i~p, <br />wall cabinet 4.0 If 85.00 340 3~Q' <br />wait / reception <br />counter 9.0 If 275.00 2,475 2,475 <br />storage / workroom <br />base cabinet 42.5 If 165.00 7,013 7,(313' <br />wall cabinet ` 14.0 If 85.00 1,190 1,'190' <br />waiting <br />through-wall counter 7.0 If 75.00 525 '525' <br />Subtotal . 26,515 0 26,',5'15' 0.94 <br />TOTAL - WOOD & PLASTICS $29,343 ' $0 $29,343 1.04 <br />MOISTURE - THERMAL CONTROL <br />Firesafing <br />allowance <br />28,279 sf 0.02 500 <br />'S00' <br />Subtotal <br />Caulking 8~ Sealants <br />caulking / sealants 500 <br /> <br />28,279 sf 0.07 1,980 0 500' <br /> <br />1,980 <br />Subtotal 1,980 0 1;9$0' <br />TOTAL - MOISTURE - THERMAL CONTROL $2,480 $0 ' $2,480' 0.09 <br />Third Floor Tenant Improvements Detail Estimate - Page 2 <br />