My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Courthouse Square Agreements (compiled notebook)
>
CS_Courthouse Square
>
Courthouse Square Agreements (compiled notebook)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 11:38:20 AM
Creation date
9/6/2011 11:59:51 AM
Metadata
Fields
Template:
Building
RecordID
10322
Title
Courthouse Square Agreements (compiled notebook)
Building
Courthouse Square
BLDG Document Type
Contracts - Agreements
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARTICLE 8 .~ Ti~entti~ percent oC the lotal compensation asic <br />SUSPENSION OR and Additional Se~~ice <br />TERMINATION earned datc if <br />, <br />~ ABANDONMENT termination occurs before r du ' g llie predesign, <br />site anal}~sis, or Schematic gn Phases; or <br />8.1 This Agree~m^nt may be terminated by either part~~ <br />upon not (ess thanlse~re~ days' ~vritten notice should the other .2 Ten percent of the l co pensation for Basic and <br />pactY fail substantial(~- to perform in accordance ~~~ith the Additiona( S ices earn to date if termination <br />terms of this Agreemeni through no fault of [he pam~ occurs d~ g the Design D velopment Phase; or <br />initiating the termination. <br />S e~ S p~s .~.\ .3 i~~e percent of tl~e total co ipensation for Basic and <br />8.2 [f llie Project is suspended b~ the O~~ner for more Addilional Senices earne to date iC termination <br />than ~0 consecutive da~~s, the Architect shall be compensated b. <br />for sen~ices perfornled prior to notice of such suspension. <br />When lhe Project is resumed, the Architect's compensalion <br />shal( be equitably adjusted to pro~~ide for expenses incurred ARTICLE <br />in the intercuption and resumption of the Architect's MISCELLANEOUS P OVISIONS <br />SCR'ICCS. <br />S e e. S P ts • a•\ 9.1 Unless othern~ise provided, <br />this Agreement shall be <br />• ~ governed b}~ the law of the <br />upon not less than seven days' written notice to rchitect °^~ ~~~~~~ S} ~~ •f .. - <br />in the event that the Project is ntl~~ abandoned. If <br />the Project is abando , the O~vner for more than 90 9.2 Ternls in this Agreemen shall have the same <br />s, the Architect ma~~ terminate this meaning as those in AIA D <br />consecutiv <br />~ ument A20l, General <br />_ <br />Conditions of the Contract for Cons ruction, current as of the <br />5 Q Q S P ts• ~ date of this Agreement. <br />8.4 Failure of the Owner to make pa}~ments to tlie <br /> <br />~~chitect in accordance with this Agreenien/t shall be • <br />erforntance and/ cause for Agreement pertaining to acts or <br />red substantial non <br />'d <br />ai(ures lo act shall <br />p <br />e <br />o-~ ~e~ s~~E~ ~yl 5 deemed to have accrued and th <br />ination <br />~~ <br />~-\ applicable stat s of <br />. <br />Q~ nJ <br />C1 <br />tvf. <br />~o~ ~^ ~~SP~,~~ limitations shall commence to run <br />ot later than ither the <br />8.5 If the Owner fails to make/payment when due the date of Substantial Completion fo acts or ures to act <br />Arcltitect for services and expense~the Architect may, upon occurring prior to Substantial Co ipletio or the date of <br />seven days' written notice lo the O«-ner. suspend issuance of the Cinal Cerlificate r .~ment for acts or <br />performance of sen-ices under lhis Agreement. Unless failures to act occurring after Substa ~al Completion. <br />pa~mtent ~-~kl- is received by the Architect «ithin se~~en <br />~ <br />ect <br />da~~s of the date of the notice, the suspension sha(l take effect 9.4 The Owner and Arc ~~~ai~~e all rights againsl <br />~vithout fuRher notice. In the e~~enl of a suspension of each other and against th contra ors. consultants. agenls <br />sen~ices. the Architect sha(1 ha~~e no liabilih- to the O~~~ner and emplo~•ees of the her for d mages. but onl~ to the <br />for detay or damage caused the O«~ner because of sucli extent co~~ered by operty insura ce during construction. <br />suspension of services. e~cepl such righ as llie~~ ma~~ hav to the proceeds o[ such <br />~ p Q s P`s - 5. ~ insurance as forth in lhe edition of A[A Document A2U l. <br />.g~ r.~ , ~~ .~ «~ ~,; ~~c General C dilions of the Contract or Construction. current <br />the Architect shall be compensated for ices as of t date oC lhis Agreenient. <br />Arcliitect he O« ner and Architect <br />, <br />performed prior lo termination, together ~~ith ~mbursable eac shall require similar ~vai~~er Crom their contractors. <br />Ezpenses then due and all Termination enses as defined <br />in Paragraph 8.7. <br />8.7 Termina(ion .-penses arc in addition to <br />conipensation fo sic and Additional Sen ices. and include <br />cxpenses ~ch are directh~ attributablc to termination. <br />Ten ation Expeiises shall be computed as a percen(agc oC <br />~ <br />~D(~CUA1fT~' f[3141 - O\1'\ER-:\RCI{ITGCT aGREE\(E\T - 1'Ol~R1~CE\1~H GDII~fOi~ -,~1:~ - COI'1'RIGHT I9Q7 - l l{ ::L'~fE:RIC-L~ 1\STITI'~l~E <)I <br />aRCHITI:CTS. 1735 T~'L~1 l ORI: .A\'C-ivU(i 1~.\1'.. \i':\SHl?~G I~ON. D C 3000G-S292 : l~nlic~•ns~•d photixop~'ing ~'iol~t ~ llS. ~op right la~~s and is subi~~~t to I~•gal <br />~r~Xecution "(l~is d~xum~m ~~:~s tlz~Kronicall~ prcxiucrd ~cith 1ht ptmiiscion .~f th~ .~1.~ and t:u~ ht rtrmciuctd ~~~ithout ~ iol~iion un~ii th~~ c~tr of t~piration as notrd lxlo~~ <br />Electroi~icF rmat B(~1-1957 <br />User pocument: B1419637.DOC -- 4/22/1997. AIA License Number 100632, which expires on 8/31/ 997 -- Page #9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.