My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Special Project Oversight Committee (SPOC) Report #1
>
CS_Courthouse Square
>
Special Project Oversight Committee (SPOC) Report #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:44:14 AM
Creation date
9/6/2011 12:12:53 PM
Metadata
Fields
Template:
Building
RecordID
10317
Title
Special Project Oversight Committee (SPOC) Report #1
Company
Marion County
BLDG Date
11/14/1997
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9601 Courthouse Square Research
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Summary <br />~ <br /> ;' <br />~ RENCE/KELLY CONSTRUGTtON, INC. <br />_ <br /> Courthouse Square St~ee-tscape 24rro~-s7 <br />Sidewalk/Curb Improvements• <br />curb & gutter w/ related asphalt work $55,700 <br />sidewalk & driveway approaches $169,132 <br />brick thin-set pavers $195,240 <br />resignalization (allowance) $50,000 <br />brick, glazing and precast finishes at shelter arcades and towers $339,395 <br />striping and handicap signage for street parking $2,000 <br />subtotal ~811,468 <br />Street Furnishings <br />landscape and irrigation at tree wells (54)ea. $27,000 <br />tree grates 6'x6' (54)ea. $59,508 <br />benches (12)ea. $9,360 <br />trash receptacles (5)ea $2,5pp <br />planter pots at plazas (12)ea $21,gpp <br />bike racks (3)ea $2,760 <br />flag poles at Hatfield Plaza (4)ea $g,ppp <br />street lamps and poles (28)ea $98,000 <br />misc. lighting at weather shelters (allowance) $35,000 <br />subtotal $263,728 <br />Weather Protection Facilftfes <br />perimeter weather protection shelters at building perimeter $220,604 <br />clock tower, arcade and comer weather protection shelters from street $123,895 <br />truss weather protection shelters at bus entrances $205,o72 <br />subtotal $549,571 <br />Sanitary Sewer Upgrade <br />traffic control $6,635 <br />earth wo~lc $~ 3,270 <br />pipe work $3,540 <br />new manhole $11,060 <br />surface restoration $g,2g5 <br />subtotal $42,800 <br />Remove and Replace Old Bus Station in High Street <br />Remove Island $18,500 <br />surface restoration $16,500 <br />new curb and sidewalk at comers only (2)ea $10,000 <br />subtotal 545,000 <br />Subtotal $1,712,567 <br />General Conditions/OH 8 ProfiUPermits $234,811 <br />Total Contractor Costs $1,947,378 <br />Architectural and Engineering Costs $116,843 <br />Total Streetscape Costs " $2,064,221 <br />' Demolition costs for the existing sidewalks has been paid for under the main project <br />''Alternate #1 and #2 are included in this cost <br />This cost represents the true cost of the streetscape package. <br />This does not necessaril re resent the fundin re uested from the Ci of Salem's urban renewal fund <br />Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.