My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Special Project Oversight Committee (SPOC) Report #1
>
CS_Courthouse Square
>
Special Project Oversight Committee (SPOC) Report #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:44:14 AM
Creation date
9/6/2011 12:12:53 PM
Metadata
Fields
Template:
Building
RecordID
10317
Title
Special Project Oversight Committee (SPOC) Report #1
Company
Marion County
BLDG Date
11/14/1997
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9601 Courthouse Square Research
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ciry Summary <br />~ <br /> ' <br />~ PENCE/KELLY CONSTRUGTION, It~IC: <br /> Sfreetsca <br />e <br />alf <br />m <br />t <br />' <br /> p <br />: <br />e <br />a <br />e: # 1 NW <br />Courtyard: 2a-r~o~-s~ <br /> <br />SidewalWCurb Improvements• <br />curb & gutter w/ related asphalt work $~ <br />sidewalk & driveway approaches $8 <br />228 <br />brick thin-set pavers , <br />$5 <br />210 <br />resignalization (allowance) , <br />$Q <br />brick, glazing and precast finishes at shelter arcades and towers $p <br />striping and handicap signage for street parking $~ <br />subtotal <br />Street Furnishings $13,438 <br />landscape and irrigation at tree wells (54)ea. $~ <br />tree grates 6'x6' (54)ea. $Q <br />benches (12)ea. $0 <br />trash receptacles (5)ea. $~ <br />planter pots at plazas (12)ea $7,200 <br />bike racks (3)ea $0 <br />flag poles at Hatfield Plaza (4)ea $~ <br />street lamps and poles (28)ea $Q <br />misc. lighting at weather shelters (allowance) $0 <br />subtotal <br />Weather Protection Facilities $7,200 <br />perimeter weather protection shelters at building perimeter $p <br />clock tower, arcade and comer weather protection shelters from street $p <br />truss weather protection shelters at bus entrances $p <br />subtotal <br />Sanitary Sewer Upgrade $0 <br />traffic control $~ <br />earth work $0 <br />pipe work $0 <br />new manhole $0 <br />surface restoration $~ <br />subtotal SO <br />Remove and Replace Old Bus Station in High Street <br />Remove Island $~ <br />surface restoration $~ <br />new curb and sidewalk at comers only (2)ea $p <br />subtotal SO <br />Subtotal $20,638 <br />General Conditions/OH 8~ ProfiVPeRnits $2,818 <br />Total Contractor Costs $23,456 <br />Architectural and Engineering Costs $1,407 <br />Total Streetscape Costs " $24,863 <br />' Demolition costs for the existing sidewalks has been paid for under the main project <br />''Alternate #1 and #2 are included in this cost <br />This cost rep~esents the true cost of the streetscape package. <br />This does not necessaril re resent the fundin re uested from the Ci of Salem's urban renewal fund <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.