My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Special Project Oversight Committee (SPOC) Report #1
>
CS_Courthouse Square
>
Special Project Oversight Committee (SPOC) Report #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:44:14 AM
Creation date
9/6/2011 12:12:53 PM
Metadata
Fields
Template:
Building
RecordID
10317
Title
Special Project Oversight Committee (SPOC) Report #1
Company
Marion County
BLDG Date
11/14/1997
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9601 Courthouse Square Research
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Summary <br />~ <br />,~ PENCE/KELLY ~ONSTRUCTION, INC. <br />~ <br />Streetscape ~4ltemate #2 Chemet~eta Strest <br />ralk/Curb Improvements' <br />curb & gutter w/ related asphalt work <br />sidewalk & driveway approaches <br />brick thin-set pavers <br />resignalization (allowance) <br />brick, glazing and precast finishes at shelter arcades and towers <br />striping and handicap signage for street parking <br />t Furnishings <br />landscape and irrigation at tree wells (54)ea. <br />tree grates 6'x6' (54)ea. <br />benches (12)ea. <br />trash receptacles (5)ea. <br />planter pots at pfazas (12)ea <br />bike racks (3)ea <br />flag poles at Hatfield Plaza (4)ea <br />street lamps and poles (28)ea <br />misc. lighting at weather shelters (allowance) <br />Protection Facillties <br />perimeter weather protection shelters at building perimeter <br />clock tower, arcade and comer weather protection shelters from street <br />truss weather protection shelters at bus entrances <br />~ry Sewer Upgrade <br />traffic control <br />earth work <br />pipe work <br />new manhole <br />surface restoration <br />Remove and Replace Old Bus Statlon in High Street <br />Remove Island <br />surface restoration <br />new curb and sidewalk at comers only (2)ea <br />General Conditions/OH & ProfiUPermits <br />subtotal <br />subtotal <br />s <br />$13,675 <br />$16,853 <br />$52,500 <br />$0 <br />$8,000 <br />$1,000 <br />$92,028 <br />$5,500 <br />$12,122; <br />$3,900 <br />$0 <br />$0 <br />$0 <br />$0 <br />$24,500 <br />$0 <br />546,022 <br />$105,433 <br />$0 <br />$0 <br />$105,433 <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />Total Contractor Costs $276,728 <br />Arohitectural and Engineering Costs $16,604 <br />Total Streetscape Costs " $293,331 <br />' Demolition costs for the existing sidewalks has been paid for under the main project <br />''Altemate #1 and #2 are included in this cost <br />~~ This cost represents the true cost of the streetscape package. <br />~r~r This does Rot necessaril re resent the fundin re uested from the_City of Salem's urban renewal fund <br />Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.