Laserfiche WebLink
From: RANDY CURTIS <br />To: ch2fam,JSears <br />Date: 8/26/98 11:07am <br />Subject: Finalize floor plans for Ch2 <br />The final floor plans for Courthouse Sq. are completed. One change has <br />occurred that impacts some offices. A third elevator has been added accross <br />the lobby from the original two elevators. Some department lobbly/reception <br />areas are impacted by this addition. <br />The BOC is scheduled to give final approval to the design development (DD) <br />plans on Sept. 2nd. Authorization will then be given to the architect to <br />proceed with construction drawings and documents. <br />Copies of the floor plans are available at the facilitv office in the <br />Courthouse. I will be distributing some of these plans to you today (Wed) as <br />time permits. Its important that we recieve your signoff prior to the Board's <br />action on the 2nd. <br />I will be out the office from Aug 27th thru Sept. 1st. In my absence, would <br />you contact Bob McCune regarding the floor plans. Questions regarding policy <br />issues should be directed to Billy Wasson. <br />CC: BMcCune <br />