SALEM. COURTHOUSE SQUARE, INC. SECTION 00300
<br />ASBESTOS ABATEMENT ~p
<br />1997 PAGB 1 OF 2
<br />PROPOSAL
<br />SALEM COURTHOUSE SQUARE, INC.
<br />ASBESTOS ABATEMENT
<br />OF
<br />ALL STRUCTURES BOUNDED BY COURT STREET, CHURCEI STREET,
<br />CHEMEKETA and HIGH STREET IN SALENI, OREGON
<br />1997
<br />301 This abatement must be coordinated with the demolition contractor to meet established dates of
<br />completion. Having carefully examined the project specifications and conditions relating to the work,
<br />the undersigned agrees to enter into a contract with Marion County to fiunish all labor, materials and
<br />other services required by, and in strict accordance with the plans and specifications for the following
<br />sum:
<br />Base Proposal Amount:
<br />Remove and dispose of all asbestos containing materials except materials aloud to remain as demolition
<br />debris such as asphalt impregnated mastics and roofing materials. This project includes a Base Pcoposal
<br />of removal and disposal of approximately 12,000 ln. ft. of Thermal System Insulation, 5,814 sq. ft. of
<br />Sheet Vinyl Flooring, 29,388 sq. ft. of 9x9 and 12x 12 Floor Tile, 370 sq. ft. of Floor Tile under Sheet
<br />Vinyl, 80 sq. ft.of Fumace Lining, 315 sq. tt, of Cement Asbastos Boazd, all Fire Doors, 1,856 sq.fr. of
<br />Drywall and Taping Compound, 696 sq. fr. of lxl Ceiling Tile and Mastic, 3,000 sq. ft. of friable built-
<br />up Roofing, 7,950sq. fr, of Ceiling Acoustical, Cove Base Mastic, 200 sq. ft of Stair Tread MasGc,
<br />2,100 sq. ft. of Duct Insulation, 10 sq. ft. of Vibration Joint Cloth, Leveling Compound in flooring,
<br />3,4~0 sq. ft. of 2x4 Ceiling Tile, all Silver Paint on ducts and flashing, 12,000 sq. ft. of Silver Paint on
<br />built-up rooFing, 600 sq. ft. of Plashing Sealer Cloth, 5,000 sq. ft. of Plaster Exterior building material,
<br />160 sq, ft. Ceramic Tile Mastic, 360 sq. Ft. of Cacpet Mastic and make pliable 30,387 sq. ft. of 9x9 and
<br />12x 12 Floor Tile Masdc.
<br />Trro hundred thirty two thousand one hundred seventy fifie dollars.... $ 232,175.00 ...............
<br />Additive Alternate Proposals:
<br />Per-Uuit Cost for the removal and disposal of Thermal System Insulationi cosdsq.ft.. ..._... $ s.oo
<br />Per-Unit Cost for the removal and disposal of Thermal System Insulation:cost/In.ft... ....... $ 7•50
<br />Per-UniK Cost for the removal and disposal Of additional Floor Tile: cosVsq.fi ........... ....... $ 3.25
<br />Per-Unit Cost for the removal and disposal of Drywall/I'aping Compound: cosUsq.ft. ...$ 9.00
<br />Per-Unit Cost for the removal and disposal of Sheet Vinyl; cosUsq.ft . . . . . . . . . . . . . . . . $ ll.on
<br />Per-Unit Cost for the removal and disposal of btilt-up Roofing: cosUsq.ft . . . . . . . . . , . . $ $•~
<br />Per-Unit Cost for the removal and disposal of Ceiling Acoustical: cosUsq.ft. ....... ...~ 6.50
<br />Courlhause Squaze Projec[
<br />Amendment #il
<br />Mazch 24, 1997 g