Laserfiche WebLink
City Summary <br /> ' PENGE/KELL~' ~ONSTRUGTI~N, INC. ' <br /> ~ _ <br />~ourthouse Squcare Streetscape _ <br />24-rvo~-s~ <br />Sidewaik/Curb Improvements" <br />curb & gutter w/ related asphalt work $55,700 <br />sidewalk & driveway approaches $169,132 <br />brick thin-set pavers $195,240 <br />resignalization (allowance) $50,000 <br />brick, glazing and precast finishes at shelter arcades and towers $339,395 <br />striping and handicap signage for street parking $2,000 <br /> subtotal $811,468 <br />Street Furnishings <br />landscape and irrigation at tree wells (54)ea. $27,000 <br />tree grates 6'x6' (54)ea. $59,508 <br />benches (12)ea. $9,360 <br />trash receptacles (5)ea $2,500 <br />planter pots at plazas (12)ea $21,600 <br />bike racks (3)ea $2,760 <br />flag poles at Hatfield Plaza (4)ea $8,000 <br />street lamps and poles (28)ea $98,000 <br />misc. lighting at weather shelters (allowance) $35,000 <br /> subtotal $263,728 <br />Weather Protection Facilitles <br />perimeter weather protection shelters at building perimeter $220,604 <br />clock tower, arcade and comer weather protection shelters from street $123,895 <br />truss weather protection shelters at bus entrances $205,072 <br /> subtotal $549,571 <br />Sanitary Sewer Upgrade <br />traffic control $6,635 <br />earth wor{c $13,270 <br />pipe work $3,540 <br />new manhole $11,060 <br />surface restoration $8~295 <br /> subtotal $42,800 <br />Remove and Replace Old Bus Station in High Street <br />Remove Island $18,500 <br />surface restoration $16,500 <br />new curb and sidewalk at comers only (2)ea $10,000 <br /> subtotal $45,000 <br />Subtotal $1,712,567 <br />General Conditions/OH 8~ ProfiUPermits $234,811 <br />Total Contractor Costs $1,947,378 <br />Architectural and Engineering Costs $116,843 <br />Total Streetscape Costs " $2,064,221 <br />' Demolition costs for the existing sidewalks has been paid for under the mai n project <br />""Alternate #1 and #2 are included in this cost <br />This cost represents the true cost of the streetscape package. <br />This does not necessaril re resent the fundin r uested from the Ci of Salem's urban renewal fund <br />Page 12 <br />