My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Financial- Salem, City of (Streetscape)
>
CS_Courthouse Square
>
Financial- Salem, City of (Streetscape)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 3:34:12 PM
Creation date
9/7/2011 2:41:38 PM
Metadata
Fields
Template:
Building
RecordID
10225
Title
Financial- Salem, City of (Streetscape)
Company
Marion County
BLDG Date
12/24/1997
Building
Courthouse Square
BLDG Document Type
Finance
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ <br />~~ <br />~ <br />: ' <br />~ PENCElI~ELLY ~ON'STR'~1CTION, ING. <br />PI'OJ@Ct: COURTHOUSE SOUARE "STREETSCAPE" <br />Estimate Type• Preliminary Budget <br />Location: • High and Court Streets <br />Attention: Marion County/Salem Area Transit Estimator : David Hays <br />Architect : Arbuckle Costic Arch. <br />Drawing Date: August 26, 1997 <br />Structure: 5 Story Plan <br />Date: November 24, 1997 <br />Gross Square Feet: <br />52,205 <br />Includes Altemates <br />DESCRIPTION COST COST/S.F. <br />Sitewo rk $681,000 $13.04 . <br /> <br />Foundations ~2,s~o $o.os <br /> <br />Substructure $o $o.oo <br /> <br />Su erstructure $407,712 $7•81 <br />Exterior Closure $299,395 $5.73 <br />Roofin $107,131 $2.05 <br /> <br />Interior Construction $o $o.oo <br />Conve in S stems $o $o.oo <br />Mechanical $41,ss$ $o.so <br />Electrical $173,000 $3.31 <br />Subtotal $1,712,567 $32.80 <br /> <br />General Conditions/Permit $146,505 $2•81 <br />Subtotal $1,859,072 $35.61 <br /> <br />Contractor OH & Profit ~sa,sos $i.ss <br />Total Contractor Cost $~,sa~,s~s $3~.30 . <br />Contractor's Standard Exclusions: <br />1. NA 9. Site Survey & Boundary Control <br />2. Storm Sewer Revisions 10. Soils Report <br />3. Systems Development 8~ LID Costs <br />4. Testing & Inspection Costs 11. Environmental Assessment Survey <br />12. Hazardous 8~ Toxic Waste Removal <br />5. Builder's Risk Insurance Premiums 13. Removal of Soil Contaminated by <br />& Deductibles Hazardous or Toxic Wastes <br />7. NA 14. Utilities are assumed to be within <br />8. Owner's Legal & Financing Costs 100' of Building connection point <br />
The URL can be used to link to this page
Your browser does not support the video tag.