My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Remedial Action Report Construction Phase
>
CS_Courthouse Square
>
Remedial Action Report Construction Phase
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:38:48 PM
Creation date
9/8/2011 8:32:05 AM
Metadata
Fields
Template:
Building
RecordID
10337
Title
Remedial Action Report Construction Phase
Company
Century West Engineering
BLDG Date
11/9/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
691
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5.5 Former Lui Property (Area 2) <br />During pre-construction activities, a 1,500-gallon heating-oil UST was encountered beneath the <br />northwest corner of the Liu building's basement (Figure 3). On October 16, 1997, Marion County <br />decommissioned the UST by removal (Century West 1998a). Approximately 1,085 tons of <br />petroleum impacted soil were removed in the vicinity of the Liu UST during decommissioning <br />activities. Concentrations of petroleum hydrocarbons detected in confirmation soil samples collected <br />from the excavation were less than the soil matrix cleanup levels except for one location adjacent <br />to a sewer pipe along the western excavation boundary. <br />During the construction phase, the sewer line was removed and approximately eight tons of diesel- <br />impacted soil was excavated for off-site disposal. Groundwater was not observed in the Area 2 <br />excavation. Confirmation soil sample 2-10-15.0 was collected from the bottom of the excavation <br />and analyzed for NWTPH-Dx. Figure 7 shows the location of soil sample 2-10-15.0 and the extent <br />of contaminated soil removed from Area 2 during the construction phase. <br />No diesel range petroleum hydrocarbons were detected in confirmation soil sample 2-10-15.0 (Table <br />2). <br />Although groundwater was not obser~~ed in the Area 2 excavation, dewatering was performed for <br />construction purposes from Sump 5, located near Area 2. After pumping from the sump for at least <br />24 hours and allowing groundwater to recharge, a water sample labeled SW-Influent was collected <br />from Sump 5 on May 27, 1999 for NWTPH-Dx and BTEX analysis. Figure 4 shows the location <br />of Sump 5. <br />Diesel was not detected in water sample SW-Influent collected from Sump 5 on May 27, 1999 <br />(Table 15). BTEX concentrations in this sample were significantly below the applicable RBCA Tier <br />I RBSLs (Table 15). <br />5.6 Former Chevron Property (Areas 6, 7, and 20) <br />Area 6 <br />During pre-construction remedial actions, approximately 3,800 tons of gasoline impacted soil were <br />removed from Area 6, located in the southeast corner of the Courthouse Square property (Century <br />West 1998c). The depth of the remedial eYCavation ranged between 15 and 20 feet below street <br />grade. Analytical results for soil samples collected from Area 6 indicated that approximately 300 <br />cubic yards of gasoline impacted soil was left in place in the southeast corner of the Chevron <br />property. <br />Construction Phase - Remedial Actions - 16 - 4080600127 <br />Courthouse Squaze November 9, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.