My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Remedial Action Report Construction Phase
>
CS_Courthouse Square
>
Remedial Action Report Construction Phase
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:38:48 PM
Creation date
9/8/2011 8:32:05 AM
Metadata
Fields
Template:
Building
RecordID
10337
Title
Remedial Action Report Construction Phase
Company
Century West Engineering
BLDG Date
11/9/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
691
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
During the construction phase, additional excavation of contaminated soil was completed east of the <br />pre-construction excavation limits. Approximately 191 tons of contaminated soil were removed <br />from the excavation for off-site disposal. Groundwater was observed in the Area 6 excavation. Soil <br />sample 6-49-16.0 was collected from the excavated soil and analyzed to evaluate disposal options. <br />Confirmation samples 6-50-16.0 through 6-57-16.0 were collected from the completed excavation <br />and analyzed forNWTPH-Gx, NWTPH-Dx, and BTEX. Figure 8 shows the location ofthe samples <br />and the extent of contaminated soil removed from Area 6 during the construction phase. <br />Sump 1 was installed to dewater the southeast portion of the Courthouse Square property, including <br />Area 6. After pumping from the sump for at least 24 hours and allowing groundwater to recharge, <br />seven water samples (labeled Influent and SE-Influent) were collected from Sump 1 between April <br />14, 1999 through May 19, 1999. The samples were analyzed for NWTPH-Dx and BTEX. Figure <br />4 shows the location of Sump 1. <br />No diesel or heavy-oil range petroleum hydrocarbons were detected in the confirmation samples. <br />Gasoline was detected at concentrations exceeding the matrix cleanup level of 80 mg/kg in soil <br />samples 6-50-16.0 (480 mg/kg), 6-51-16.0 (230 mg/kg), and 60-52-18.0 (86 mg/kg). However, the <br />BTEX concentrations detected in these samples were below the applicable RBCA Tier I RBSLs <br />(Table 10). <br />Diesel was not detected in any of the water samples collected from Sump 1 except the May 4, 1999 <br />water sample which contained diesel at a concentration of 0.28 mg/L (Table 15). BTEX <br />concentrations detected in the Sump 1 samples were significantly below the applicable RBCA Tier <br />I RBSLs. <br />Area 7 <br />During pre-construction remedial actions, approYimately 15 tons of lube oil range impacted soil was <br />removed from Area 7, located in the southeast corner of the Courthouse Square property (Century <br />West 1998b). During the construction phase, additional excavation of contaminated soil was <br />required in this area due to the unsuitable geotechnical properties of the soil. Approximately 115 <br />tons of contaminated soil was removed for off-site disposal. <br />Soil sample 7-SP-1 was collected from the e~cavated soil pile and analyzed for NWTPH-HCID to <br />evaluate disposal options. Confirmation samples 7-4-12.5 through 7-8-14.5 were collected from the <br />bottom of the excavation and analyzed for NWTPH-HCID and NWTPH-Dx. Figure 8 shows the <br />location of the samples and the extent of contaminated soil removed from Area 7 during the <br />construction phase. <br />No petroleum hydrocarbons were detected in the confirmation samples (Table 11). <br />Construction Phase - Remedial Actions - l7 - 4080600127 <br />Courthouse Square November 9. 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.