My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Remedial Action Report Construction Phase
>
CS_Courthouse Square
>
Remedial Action Report Construction Phase
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:38:48 PM
Creation date
9/8/2011 8:32:05 AM
Metadata
Fields
Template:
Building
RecordID
10337
Title
Remedial Action Report Construction Phase
Company
Century West Engineering
BLDG Date
11/9/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
691
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pernut Number: 1500A <br />Expiration Date: 6/30/2000 <br />Page 4 of 10 Pages <br />SCHEDULE D <br />~ecial Conditions <br />1. A"contact person" shall be designated to coordinate and carry out all necessary functions related to <br />maintenance and operation of waste collection, treatment, and disposal facilities. <br />2. All free product shall be removed and disposed in accordance with applicable n1es. <br />3. Prior to tiie use of any storm sewer system, the permittee sha:l have .vritten permission fror~ the <br />owner of the storm sewer. <br />4. The pemuttee shall notify the Department within 24 hours of any breakdown or failure of the <br />treatment system or failure to meet the effluent limitations. <br />5. This pernut applies only to facilities that dischazge treated water from petroleum hydrocazbon <br />cleanup operations and does not apply to any other cleanup operation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.