My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Remedial Action Report Construction Phase
>
CS_Courthouse Square
>
Remedial Action Report Construction Phase
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:38:48 PM
Creation date
9/8/2011 8:32:05 AM
Metadata
Fields
Template:
Building
RecordID
10337
Title
Remedial Action Report Construction Phase
Company
Century West Engineering
BLDG Date
11/9/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
691
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pernut Number: 1500A <br />Expiration Date: 6/30/2000 <br />Page 3 of 10 Pages <br />SCHEDULE B <br />1. Minimum Monitoring Requirements <br />A. Outfall Number 001 (the permittee shall sample in accordance with the following sampling frequency <br />from start-up to six months after startup) <br />Item or Parameter <br />Minunum Frequency Sample Type <br />VJeekly* <br />Weekly* <br />Weekly* <br />Weekly <br />Weekly <br />Monthly <br />Estimate <br />Grab <br />Grab <br />Grab <br />Grab <br />Grab <br />Flow <br />pH <br />Total Petroleum Hydrocarbons <br />Benzene <br />BETX <br />Lead** <br />* For the first five days of discharge, flow, pH, and total petroleum hydrocarbons (TP~ shall be measured <br />daily. <br />B. Outfall Number 001 (the permittee shall sample in accordance with the following sampling frequency <br />after six months from startup) <br />Item or Parameter <br />Minimum Frequencv Sample Type <br />Monthly <br />Monthly <br />Monthly <br />Monthly <br />Monthly <br />Monthly <br />Estimate <br />Grab <br />Grab <br />Grab <br />Grab <br />Grab <br />Flow <br />pH <br />Total Petroleum Hydrocarbons <br />Benzene <br />BETX <br />Lead** <br />** The requirement to monitor for lead applies only to those facilities that are treating water contaminated <br />with leaded fuels and where detectable levels of lead have been found in the influent to the treatrnent <br />system. <br />2. Reporting Requirements <br />Monitoring results shall be reported on approved forms. The reporting period is the calendar month. <br />Reports must be submitted to the Department by the 15th day of the following month. <br />
The URL can be used to link to this page
Your browser does not support the video tag.