Laserfiche WebLink
Pernut Number: 1500A <br />Expiration Date: 6/30/2000 <br />Page 3 of 10 Pages <br />SCHEDULE B <br />1. Minimum Monitoring Requirements <br />A. Outfall Number 001 (the permittee shall sample in accordance with the following sampling frequency <br />from start-up to six months after startup) <br />Item or Parameter <br />Minunum Frequency Sample Type <br />VJeekly* <br />Weekly* <br />Weekly* <br />Weekly <br />Weekly <br />Monthly <br />Estimate <br />Grab <br />Grab <br />Grab <br />Grab <br />Grab <br />Flow <br />pH <br />Total Petroleum Hydrocarbons <br />Benzene <br />BETX <br />Lead** <br />* For the first five days of discharge, flow, pH, and total petroleum hydrocarbons (TP~ shall be measured <br />daily. <br />B. Outfall Number 001 (the permittee shall sample in accordance with the following sampling frequency <br />after six months from startup) <br />Item or Parameter <br />Minimum Frequencv Sample Type <br />Monthly <br />Monthly <br />Monthly <br />Monthly <br />Monthly <br />Monthly <br />Estimate <br />Grab <br />Grab <br />Grab <br />Grab <br />Grab <br />Flow <br />pH <br />Total Petroleum Hydrocarbons <br />Benzene <br />BETX <br />Lead** <br />** The requirement to monitor for lead applies only to those facilities that are treating water contaminated <br />with leaded fuels and where detectable levels of lead have been found in the influent to the treatrnent <br />system. <br />2. Reporting Requirements <br />Monitoring results shall be reported on approved forms. The reporting period is the calendar month. <br />Reports must be submitted to the Department by the 15th day of the following month. <br />