My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition Report
>
CS_Courthouse Square
>
Demolition Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:43:32 PM
Creation date
9/8/2011 9:20:27 AM
Metadata
Fields
Template:
Building
RecordID
10334
Title
Demolition Report
Company
Century West
BLDG Date
6/5/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
568
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATON CONSTRUCTION, INC. <br />29394-B AIRPORT RD. EUGENE, OR 97402-9594 <br />(541)461-0543 FAX 461-0545 <br />David Hartwig May 28, 1997 <br />MARION COUNTY ~ <br />100 High St. N.E. ~ ~ <br />Salem, OR 97301 <br />~ z ~~ <br />IZE: SALEM COURTHOUSE SQUARE, Demolition Survey Report <br />ATTENDEES: Mr. David Hartwig, MARION COUNTY. ~ <br />Ms. Kathleen Thorpe, CENTURY WEST. <br />Mr. Michael Staton, STATON CONST. INC. <br />Dear David, <br />This Report is submitted as required by Section 01313, 1.1. Survey: <br />As we are aware the Block bounded by Court St., Church St., Chemeketa St., and High St. is <br />bei Demolished to make way for Salem Courthouse Square. We will be removing all above <br />qround tructures and a11 Surfaces within the curb lines of this block, with the exception of the <br />basements. <br />There will be Two Access points to this project. Pedestrian traffic will enter the project thru our <br />temporary office located at the N.W Corner of the project, at High St. and Chemeketa St. <br />Construction trai~ic will enter the Alley from the North at Chemeketa St. No other access will be <br />available. Construction traffic will egress via the alley to the South onto Court St. <br />The area in the South East corner of the Block where remediation work is being done will not be <br />altered under this contract. <br />~ As above ground structures are removed the sma11 voids will fill and the flat surfaces utilized for <br />storage of salvaged and recycle materials. <br />The Demolition sequence will o-yc~cu"r as shown on the attached Site Map, and as outlined in the <br />Work Plan. Smm~l~iterations in a~-Work Plan ~~edule may~,ccur as we progress thru the <br />project, our schedule will be updated weekly and regular meetings held. <br />Signatures: <br />David Hartwig <br />Manager <br />MARION COUNTY <br />Kathleen Thorpe <br />Area Manager <br />CENTURY WEST <br />DEQ UCENSE # 12407 & 12408 OR CCB ~ 03371 <br />~~l~iU~ <br />Michael Staton <br />Project Manager <br />STATON CONST INC. <br />EPA/DEQ ID# ORD980981237 <br />
The URL can be used to link to this page
Your browser does not support the video tag.