My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition Report
>
CS_Courthouse Square
>
Demolition Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:43:32 PM
Creation date
9/8/2011 9:20:27 AM
Metadata
Fields
Template:
Building
RecordID
10334
Title
Demolition Report
Company
Century West
BLDG Date
6/5/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
568
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
05i28i97 11~34 a 503 245 8894 CHRSC CONSULTANT P.05 <br />Trainin~ <br />Afl emplayees have received training as required by; <br />1926_59 Hazard Communication, and <br />1926.21 Safety trainin~ and 'educatian <br />1926.62(f) Respiratory Protection <br />In ~ddition all employees receive site sp~cific training (tailgate) on specific <br />hazards and the compliance pr~gram in effect for this project <br />Signs and warnings are posted as required by 1926.62(m) <br />1~, {NSPECTION BY COMPETENT PERSaN OF JOB Sl7E EQUIPM~NT AND <br />MATERIA~ S <br />Daily inspection of the job site, materials and equipment shall be made by the <br />competent person. Any deficiencies noted as well as the action faken shall be noted in <br />the daily job log. <br />13. AVAILABILITY OF WRITTEN PROGRAMS <br />7his compliance plan as well as the dai{y jab {og wil{ be availabfe for inspsction <br />by autharized personne! at the job site. <br />14, WRITTEN PROGRAMS UPpATE <br />This project is not expected to extend beyond 6 months duration. For some <br />reason, if it does ex#end beyond that period it will be reviewed and updated if nesded. <br />Compliance plan approved by: <br />r_. "t~ , <br />~ <br />Staton Construction <br />Ron Richey, Competent Person <br />CompEiance plan drawn up by: <br />~1 <br />North st Envirocpn, I c. <br />David D. Caward, CIH <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.