Laserfiche WebLink
05i28i97 11~34 a 503 245 8894 CHRSC CONSULTANT P.05 <br />Trainin~ <br />Afl emplayees have received training as required by; <br />1926_59 Hazard Communication, and <br />1926.21 Safety trainin~ and 'educatian <br />1926.62(f) Respiratory Protection <br />In ~ddition all employees receive site sp~cific training (tailgate) on specific <br />hazards and the compliance pr~gram in effect for this project <br />Signs and warnings are posted as required by 1926.62(m) <br />1~, {NSPECTION BY COMPETENT PERSaN OF JOB Sl7E EQUIPM~NT AND <br />MATERIA~ S <br />Daily inspection of the job site, materials and equipment shall be made by the <br />competent person. Any deficiencies noted as well as the action faken shall be noted in <br />the daily job log. <br />13. AVAILABILITY OF WRITTEN PROGRAMS <br />7his compliance plan as well as the dai{y jab {og wil{ be availabfe for inspsction <br />by autharized personne! at the job site. <br />14, WRITTEN PROGRAMS UPpATE <br />This project is not expected to extend beyond 6 months duration. For some <br />reason, if it does ex#end beyond that period it will be reviewed and updated if nesded. <br />Compliance plan approved by: <br />r_. "t~ , <br />~ <br />Staton Construction <br />Ron Richey, Competent Person <br />CompEiance plan drawn up by: <br />~1 <br />North st Envirocpn, I c. <br />David D. Caward, CIH <br />4 <br />