Laserfiche WebLink
to remain open, bracing would still be required there. This <br />alternate would save some money but is outside of the spec as it <br />is written. For bid comparison purposes we have included bracing <br />as described in the specification in our cost proposal. <br />RECYCLING QUANTITIES <br />Dimensional Lumber 200 cy 60 tons <br />Structural steel 186 cy 70 tons <br />Reinforcing steel (rebar) 320 cy 120 tons <br />Copper 37 cy 5 tons <br />Aluminum 41 cy 3 tons <br />Asphalt 185 cy 370 tons <br />Concrete/brick 4805 cy 9610 tons <br />Carpet/glass 17 cv 135 tons <br />TOTAL 5791 cy 10,373 tons <br />LANDFILL QUANTITIES <br />Non recycled debris <br />Dimensional Lumber <br />Structural Steel <br />Reinforcing Steel <br />Copper/Aluminum <br />7750 cy <br />1937 tons <br />RECYCLE VALUES <br />S 10, 000 . 00 <br />$ 4, 240. 00 <br />$6,000.00 <br />56,400.00 <br />ADDITIONAL INFORMATION <br />Browns Island: The unit cost to haul and dispose of <br />allowable demolition debris to Browns Island Landfill was filled in <br />as N/A or not applicable, on the bid form. Source separation <br />methods and procedures to provide for this alternate are both <br />unsafe and cost prohibitive. <br />5 <br />