My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition Report
>
CS_Courthouse Square
>
Demolition Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:43:32 PM
Creation date
9/8/2011 9:20:27 AM
Metadata
Fields
Template:
Building
RecordID
10334
Title
Demolition Report
Company
Century West
BLDG Date
6/5/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
568
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ <br />centurywest <br />ENGINEERING CORPORATION <br />Memorandum <br />To: David Hartwig, Marion County <br />Judy Crockett, Marion County <br />Mike Staton, Staton Construction <br />Subject: Staton Weekly Construction <br />Meeting <br />From: Geoff Brown <br />C.C.: Kathleen Thorpe, CWEC <br />Bill Annen, PE, CWEC <br />Date: July 8, 1997 <br />The purpose of this memorandum is to memorialize the demolition meeting held on July 3, 1997 at <br />the Courthouse Square site. The meeting was a weekly report by Staton on the overall progress and <br />status of the demolition project. <br />The meeting was attended by: <br />David Hartwig Kathleen Thorpe <br />7udy Crockett GeoffBrown <br />Mike Staton 7eff Smith, Three Rivers Environmental <br />Loni Richey <br />The following topics were discussed and are summarized as: <br />1. Demolition is ~ro~ressing on schedt~le. Staton is done tearing down the Goodman, Goldberg, and <br />1 Story Senator, and is in the process of hauling off the rubble. Upon arrival of the crane, next <br />Tuesday, Staton will commence demolishing the Senator. <br />2. Tlam~l~tinn Recycling I~proceeding at near ~lanned levels. To date, 88.27% of demolition waste <br />leaving the site has been recycled. Much of the concrete waste generated during demolition has <br />been stored on-site for shoring material, which impacts the overall percent recycled, as does the <br />brick giveaway. So the actual percentage of recycled material is probably higher. <br />A. The brick from the demo of the Community Development and Beri buildings is being <br />offered to the public and is a big hit. An article published in the Statesman Journal <br />generated hundreds of calls to Staton during the week. Over 7 semi loads of brick have <br />been removed from the site to date by the public. <br />L ~ A D I N G T H R O U G H E F F E C T I V E ~ O L'~~~ 1 I~~ N S <br />1593 Clay Street NE Salem. Oregon 97301 Phone: (503) 540-0995 FAX: (503) 589-1657 <br />
The URL can be used to link to this page
Your browser does not support the video tag.